Task rescheduling in multi-agent manufacturing
暂无分享,去创建一个
[1] John A. Carlson,et al. Risk Aversion, Foreign Exchange Speculation and Gambler's Ruin , 1998 .
[2] S. Misbah Deen. A fault-tolerant cooperative distributed system , 1998, Proceedings Ninth International Workshop on Database and Expert Systems Applications (Cat. No.98EX130).
[3] Peter B. Luh,et al. Scheduling of manufacturing systems using the Lagrangian relaxation technique , 1991, IEEE Trans. Autom. Control..
[4] Gerhard Weikum,et al. Database Reorganization in Parallel Disk Arrays with I/O Service Stealing , 1998, IEEE Trans. Knowl. Data Eng..
[5] Reid G. Smith,et al. The Contract Net Protocol: High-Level Communication and Control in a Distributed Problem Solver , 1980, IEEE Transactions on Computers.
[6] Gil-Haeng Lee,et al. An adaptive load balancing algorithm using simple prediction mechanism , 1998, Proceedings Ninth International Workshop on Database and Expert Systems Applications (Cat. No.98EX130).