Real-Time Performance Analysis of Industrial Serial Production Systems with Flexible Manufacturing
暂无分享,去创建一个
[1] Stephan Biller,et al. Transient analysis of Bernoulli serial lines: performance evaluation and system-theoretic properties , 2013 .
[2] Jorge Arinez,et al. Performance evaluation in finite production run-based serial lines with geometric machines , 2016, 2016 IEEE International Conference on Automation Science and Engineering (CASE).
[3] Jingang Liu,et al. Transient analysis of general queueing systems via simulation-based transfer function modeling , 2010, Proceedings of the 2010 Winter Simulation Conference.
[4] Semyon M. Meerkov,et al. Unbalanced production systems with floats: analysis and lean design , 2011, Int. J. Manuf. Technol. Manag..
[5] Cong Zhao,et al. Analysis and Improvement of Multiproduct Bernoulli Serial Lines: Theory and Application , 2015, IEEE Transactions on Systems, Man, and Cybernetics: Systems.
[6] Jong-Tae Lim,et al. Improvability of assembly systems II: Improvability indicators and case study , 2000 .
[7] Semyon M. Meerkov,et al. Transient behavior of serial production lines with Bernoulli machines , 2008 .
[8] Yao Hu,et al. Transient analysis to design buffer capacity in dairy filling and packing production lines , 2010 .
[9] John A. Sharp,et al. A review of manufacturing flexibility , 2000, Eur. J. Oper. Res..
[10] Cong Zhao,et al. Efficient Algorithms for Analysis and Improvement of Flexible Manufacturing Systems , 2016, IEEE Transactions on Automation Science and Engineering.
[11] Jingshan Li,et al. Transient Analysis of Serial Production Lines With Perishable Products: Bernoulli Reliability Model , 2017, IEEE Transactions on Automatic Control.
[12] Stephan Biller,et al. Quality/Quantity Improvement in an Automotive Paint Shop: A Case Study , 2010, IEEE Transactions on Automation Science and Engineering.
[13] Semyon M. Meerkov,et al. Transient Behavior of Two-Machine Geometric Production Lines , 2010, IEEE Transactions on Automatic Control.
[14] Liang Zhang,et al. Transient Performance Analysis of Closed Production Lines With Bernoulli Machines, Finite Buffers, and Carriers , 2017, IEEE Robotics and Automation Letters.
[15] Jorge Arinez,et al. Transient Performance Analysis of Serial Production Lines With Geometric Machines , 2016, IEEE Transactions on Automatic Control.
[16] Li Lin,et al. Metamodels of production line transient behaviour for sudden machine breakdowns , 1990 .
[17] Feng Ju,et al. Smart Manufacturing Systems based on Cyber-physical Manufacturing Services (CPMS) | NIST , 2017 .
[18] Jorge Arinez,et al. Finite Production Run-Based Serial Lines With Bernoulli Machines: Performance Analysis, Bottleneck, and Case Study , 2016, IEEE Transactions on Automation Science and Engineering.
[19] Stephan Biller,et al. Energy-Efficient Production Systems Through Schedule-Based Operations , 2013, IEEE Transactions on Automation Science and Engineering.
[20] Richard M. Feldman,et al. Manufacturing Systems Modeling and Analysis , 2008 .