Anchorage of Large-Diameter Reinforcing Bars Grouted into Ducts
暂无分享,去创建一个
[1] Sri Sritharan,et al. Preliminary results and conclusions from the PRESSS five-story precast concrete test Building , 1999 .
[2] James O. Jirsa,et al. Rationale for Suggested Development, Splice, and Standard Hook Provisions for Deformed Bars in Tension , 1979 .
[3] Catherine E French,et al. Ductile Connections for Precast Concrete Frame Systems , 1993 .
[4] Michael E. Kreger,et al. Anchorage Requirements for Grouted Vertical-Duct Connectors in Precast Bent Cap Systems , 2006 .
[5] John F. Stanton,et al. An Overview of the PRESSS Five-Story Precast Test Building , 1999 .
[6] David Darwin,et al. BOND STRENGTH OF GROUTED REINFORCING BARS , 1996 .
[7] Vitelmo V. Bertero,et al. Local bond stress-slip relationships of deformed bars under generalized excitations , 1982 .
[8] James L Noland,et al. Computer-Aided Structural Engineering (CASE) Project: Decision Logic Table Formulation of ACI (American Concrete Institute) 318-77 Building Code Requirements for Reinforced Concrete for Automated Constraint Processing. Volume 1. , 1986 .
[9] John E. Breen,et al. THE STRENGTH OF ANCHOR BARS: A REEVALUATION OF TEST DATA ON DEVELOPMENT LENGTH AND SPLICES , 1977 .
[10] Sri Sritharan,et al. Strut-and-Tie Analysis of Bridge Tee Joints Subjected to Seismic Actions , 2005 .
[11] John F. Stanton,et al. Design of Precast Concrete Piers for Rapid Bridge Construction in Seismic Regions , 2005 .
[12] Bryan E. Little,et al. American Association of State Highway and Transportation Officials. Highway Drainage Guidelines American Association of State Highway and Transportation Officials. LRFD Bridge Design Specifications , 2000 .