Project Management Competencies of Building Construction Firms: A Structural Equation Model Approach

This paper identified and assessed the importance of project management (PM) competencies of indigenous building construction firms (BCFs) in the Upper West region of Ghana. It also analyzed the relationships between the PM competency groups. Empirical evidence on 12 key PM competency groups were decoupled into 42 sub-groups. These were identified and ranked in order of importance to project success of the 44 BCFs. A structural equation model was used to assess the causal relationship between the 12 PM competencies. The findings indicate that of the 12 PM competencies, project cost management, project risk management, and project quality management emerged as the most important to the success of a project. Again, there was a strong positive relationships between and among all the 12 PM competencies. The study argues that the findings could serve as a guide for the local BCFs in their future professional training and development programs.

[1]  P. Hillebrandt Economic theory and the construction industry , 1974 .

[2]  J. Hoelter The Analysis of Covariance Structures , 1983 .

[3]  B. Thompson Two and One‐Half Decades of Leadership in Measurement and Evaluation , 1992 .

[4]  M. Yasin,et al.  A Leadership Profile of American Project Managers , 1998 .

[5]  Rex B. Kline,et al.  Principles and Practice of Structural Equation Modeling , 1998 .

[6]  P. Gardiner,et al.  Revisiting the golden triangle of cost, time and quality: the role of NPV in project control, success and failure , 2000 .

[7]  Joyce Fortune,et al.  Current practice in project management — an empirical study , 2002 .

[8]  Graham Winch,et al.  How Buildings Add Value for Clients , 2002 .

[9]  D. Bryde Project management concepts, methods and application , 2003 .

[10]  Dennis L. Jackson Revisiting Sample Size and Number of Parameter Estimates: Some Support for the N:q Hypothesis , 2003 .

[11]  Yacine Rezgui,et al.  An IT-based approach to managing the construction brief , 2003 .

[12]  Robert Loo,et al.  A multi‐level causal model for best practices in project management , 2003 .

[13]  Chung-Li Tseng,et al.  Valuing Flexibility in Infrastructure Expansion , 2003 .

[14]  Lynn Crawford,et al.  Approaches to project management in Africa: implications for international development projects , 2003 .

[15]  Paul Cook,et al.  Financing small and medium-scale contractors in developing countries: a Ghana case study , 2003 .

[16]  Durward K. Sobek,et al.  Modeling Real Options to Switch Among Alternatives in Product Development , 2003 .

[17]  Rex B. Kline,et al.  Beyond Significance Testing: Reforming Data Analysis Methods in Behavioral Research , 2004 .

[18]  G. Hancock,et al.  Evaluating Small Sample Approaches for Model Test Statistics in Structural Equation Modeling , 2004 .

[19]  R. Kline Principles and practice of structural equation modeling, 2nd ed. , 2005 .

[20]  Dean Whitehead,et al.  Project management and action research: two sides of the same coin? , 2005, Journal of health organization and management.

[21]  Andrew R.J. Dainty,et al.  Employee perceptions of empowerment , 2005 .

[22]  David N. Ford,et al.  Project management quality and the value of flexible strategies , 2006 .

[23]  T. Brown,et al.  Confirmatory Factor Analysis for Applied Research , 2006 .

[24]  Rachna Shah,et al.  Use of structural equation modeling in operations management research: Looking back and forward ☆ , 2006 .

[25]  Joyce Fortune,et al.  Framing of project critical success factors by a systems model , 2006 .

[26]  K. Bollen Interpretational confounding is due to misspecification, not to type of indicator: comment on Howell, Breivik, and Wilcox (2007). , 2007, Psychological methods.

[27]  Heidi Rasila,et al.  Service quality in outsourced facility maintenance services , 2007 .

[28]  P. Barrett Structural equation modelling : Adjudging model fit , 2007 .

[29]  Luis Eduardo Vila Lladosa,et al.  Evaluation of the Effects of Education on Job Satisfaction: Independent Single-Equation vs. Structural Equation Models , 2007 .

[30]  Jamshed Siddiqui,et al.  TQM principles' application on information systems for empirical goals , 2007 .

[31]  Michael J. Rose,et al.  Why so Fed Up and Footloose in it? Spelling Out the Associations between Occupation and Overall Job Satisfaction Shown By WERS 2004 , 2007 .

[32]  P. Mokhtarian,et al.  Telecommunications and travel demand and supply: Aggregate structural equation models for the US , 2007 .

[33]  Charity Osei-Amponsah,et al.  Analysis of the causality links between the growth of the construction industry and the growth of the macro‐economy in Ghana , 2007 .

[34]  Kenneth A. Bollen,et al.  Representing general theoretical concepts in structural equation models: the role of composite variables , 2008, Environmental and Ecological Statistics.

[35]  Pantaleo Mutajwaa Daniel Rwelamila Project management competence in public sector infrastructure organisations , 2007 .

[36]  Peter W. G. Morris Managing Project Interfaces—Key Points for Project Success , 2008 .

[37]  Edward P. Markowski,et al.  TQM—A predecessor of ERP implementation , 2008 .

[38]  James B. Grace,et al.  Structural Equation Modeling for Observational Studies , 2008 .

[39]  Paul. Olomolaiye,et al.  Competencies required by project managers for housing construction in Ghana , 2009 .

[40]  Gary Hackbarth Teaching Effectiveness and Efficiency in Project Management: A SIMPROJECT Approach , 2009, AMCIS.

[41]  B. Muthén,et al.  Exploratory Structural Equation Modeling , 2009 .

[42]  E. Hui,et al.  Measuring customer satisfaction of FM service in housing sector: A structural equation model approach , 2010 .

[43]  Samuel Laryea,et al.  THE EVOLUTION OF INDIGENOUS CONTRACTORS IN GHANA , 2010 .

[44]  Bengt Muthén,et al.  Bayesian Analysis Using Mplus , 2010 .

[45]  Will Hughes,et al.  Proceedings of the West Africa Built Environment Research (WABER) Conference 2011 (19-21 July 2011, Accra, Ghana) , 2011 .

[46]  William J. Stevenson,et al.  Operations Management , 2011 .

[47]  G. Ofori The construction industries in developing countries: Strategic review of the book , 2012 .

[48]  J. Edmonds How training in project management can help businesses to get back on track , 2010, IEEE Engineering Management Review.