Factors Relating to Labor Productivity Affecting the Project Schedule Performance in Indonesia

Construction industry faces challenges with regard to problems associated with productivity and the problems are usually associated with performance of labor. The performance of labor is affected by many factors and is usually linked to the performance of time, cost, and quality. Meanwhile identification and evaluating factors affecting construction labor productivity have been done in the last decade; however, a deeper understanding is still needed to improve the labor productivity. This study conducted with the aim to get the latest information on key factors that affect project performance in terms of project completion time and this is part of major research to model the interaction relationships between key factors affecting productivity. This paper reports on a survey made on respondents who involve in managing various types of projects in wide area in Indonesia. Respondents were required to rate using their experience how 113 factors identified from past researches, which grouped into 15 groups, affecting project schedule performance and then measured their level of affect. The result show that the groups of factors that give high effect are: supervision factors, material factors, execution plan factors, and design factors. In addition to these factors, for large companies equipment factors have also high effect. While in small and medium companies, owner/consultant factors also need special attention because it has high effect too. Research findings also show that health and safety factors has not been a concern of small and medium companies and only has some effect, while in large companies are better, although not as major concern and has average effect. The results will become worthwhile information in determining the major steps to improve the performance of project completion time and also as part of further research in modeling the interaction relationship between the key factors affecting productivity to improve the labor productivity in Indonesian construction industry.

[1]  William Ibbs,et al.  Impact of Change's Timing on Labor Productivity , 2005 .

[2]  S. Mohamed,et al.  FACTORS AFFECTING LABOUR PRODUCTIVITY IN BUILDING PROJECTS IN THE GAZA STRIP , 2007 .

[3]  Jaideep Motwani,et al.  Measuring construction productivity: a practical approach , 1995 .

[4]  H. Thomas Effects of scheduled overtime on labor productivity , 1992 .

[5]  Andrew W Gale,et al.  Human Resources Management in Construction , 1995 .

[6]  David Arditi,et al.  The JIT materials management system in developing countries , 2005 .

[7]  David R. Riley,et al.  Loss of Labor Productivity due to Delivery Methods and Weather , 1999 .

[8]  John G. Lowe,et al.  The measurement of productivity in the construction industry , 1987 .

[9]  A. K. W. Jayawardane,et al.  Construction Productivity Management , 1998 .

[10]  Moonseo Park,et al.  Effects of schedule pressure on construction performance , 2006 .

[11]  Kassim Gidado,et al.  Factors influencing construction productivity in Afghanistan , 2012 .

[12]  P. O. Olomolaiye,et al.  An evaluation of production outputs in key building trades in Nigeria , 1989 .

[13]  A. Atkinson,et al.  A Stakeholder Approach to Strategic Performance Measurement , 1997 .

[14]  Serdar Ulubeyli,et al.  Effect of basic motivational factors on construction workforce productivity in turkey , 2008 .

[15]  Jahidul Alum,et al.  Construction productivity: Issues encountered by contractors in Singapore , 1995 .

[16]  H. W. Parker,et al.  Productivity improvement in construction , 1988 .

[17]  Gary David Holt,et al.  Severity diagnosis of productivity problems - A reliability analysis , 1998 .

[18]  Awad S. Hanna,et al.  Impact of extended overtime on construction labor productivity , 2005 .

[19]  V. K. Handa,et al.  Forecasting productivity by work sampling , 1989 .

[20]  Margaret Emsley,et al.  Critical Factors Influencing Construction Productivity in Thailand , 2002 .

[21]  H. Randolph Thomas,et al.  Factors Affecting Masonry‐Labor Productivity , 1991 .

[22]  Bengt Hansson,et al.  Factors affecting the productivity of building craftsmen ‐ studies of Uganda , 2007 .

[23]  Awad S. Hanna,et al.  Impact of Shift Work on Labor Productivity for Labor Intensive Contractor , 2008 .

[24]  Badan Pusat Statistik,et al.  Statistik indonesia 2003 , 2004 .

[25]  Gary David Holt,et al.  Factors influencing craftsmen's productivity in Indonesia , 1997 .