Harvesting scheduling operations for the machinery owners under multi-farmland, multi-type situation with time window - an empirical study arising in agricultural contexts in China.
暂无分享,去创建一个
[1] Rolf H. Möhring,et al. Resource-constrained project scheduling: Notation, classification, models, and methods , 1999, Eur. J. Oper. Res..
[2] K. Neumann,et al. Methods for Resource-Constrained Project Scheduling with Regular and Nonregular Objective Functions and Schedule-Dependent Time Windows , 1999 .
[3] Klaus Neumann,et al. Resource levelling for projects with schedule-dependent time windows , 1999, Eur. J. Oper. Res..
[4] F. Barahona,et al. A column generation algorithm for solving general forest planning problems with adjacency constraints , 1994 .
[5] Rolf H. Möhring,et al. Scheduling project networks with resource constraints and time windows , 1988 .
[6] Klaus Neumann,et al. Heuristics for the minimum project-duration problem with minimal and maximal time lags under fixed resource constraints , 1995, J. Intell. Manuf..
[7] Masanori Takamoto,et al. Zero-one quadratic programming algorithm for resource leveling of manufacturing process schedules , 1995, Systems and Computers in Japan.