Genetic Algorithms and Mathematical Models in Manpower Allocation and Cell Loading Problem
暂无分享,去创建一个
[1] Geetha Srinivasan,et al. Heuristics for operator allocation and sequencing in product-line-cells with manually operated machines , 1997 .
[2] Gürsel A. Süer,et al. Manufacturing cell loading rules and algorithms for connected cells , 1995 .
[3] J. M. Moore. An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs , 1968 .
[4] C. N. Potts,et al. Analysis of a linear programming heuristic for scheduling unrelated parallel machines , 1985, Discret. Appl. Math..
[5] Gürsel A. Süer,et al. Multi-period cell loading and cell size determination , 1998 .
[6] Gürsel A. Süer,et al. Evaluation of manufacturing cell loading rules for independent cells , 1999 .
[7] Gürsel A. Süer. Minimizing the number of tardy jobs in multi-period cell loading problems , 1997 .
[8] Ja-Shen Chen,et al. Optimal solution of cellular manufacturing system design: Benders' decomposition approach , 1998, Eur. J. Oper. Res..
[9] Ronald B. Heady,et al. An efficient zero-one formulation of the cell formation problem , 1995 .
[10] Gürsel A. Süer. Optimal operator assignment and cell loading in labor-intensive manufacturing cells , 1996 .
[11] Mitsuo Gen,et al. Genetic algorithms and engineering design , 1997 .
[12] Johnny C. Ho,et al. Minimizing the number of tardy jobs for m parallel machines , 1995 .
[13] W. Maxwell. On Sequencing n Jobs on One Machine to Minimize the Number of Late Jobs , 1970 .
[14] Ronald B. Heady,et al. Forming minimum-cost machine cells with exceptional parts using zero-one integer programming , 1997 .
[15] Chung-Lun Li,et al. Single-machine scheduling with trade-off between number of tardy jobs and resource allocation , 1996, Oper. Res. Lett..
[16] C.E.R. Wainwright,et al. The application of queuing theory in the analysis of plant layout , 1996 .
[17] X. Cai,et al. A genetic algorithm for scheduling staff of mixed skills under multi-criteria , 2000, Eur. J. Oper. Res..