A new approach for frequency based short-term reliability for a power system
暂无分享,去创建一个
[1] Jeongje Park,et al. Flexible Maintenance Scheduling of Generation System by Multi-Probabilistic Reliability Criterion in Korea Power System , 2010 .
[2] L. L. Garver,et al. Effective Load Carrying Capability of Generating Units , 1966 .
[3] L. Soder,et al. A review of different methodologies used for calculation of wind power capacity credit , 2008, 2008 IEEE Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century.
[4] R. Billinton,et al. Multistate Wind Energy Conversion System Models for Adequacy Assessment of Generating Systems Incorporating Wind Energy , 2008, IEEE Transactions on Energy Conversion.
[5] Jaeseok Choi. A method for transmission system expansion planning considering probabilistic reliability criteria , 2005, IEEE Transactions on Power Systems.
[6] S. Santoso,et al. Noniterative Method to Approximate the Effective Load Carrying Capability of a Wind Plant , 2008, IEEE Transactions on Energy Conversion.
[7] Abhay Gupta,et al. Is disaggregation the holy grail of energy efficiency? The case of electricity , 2013 .
[8] Mohammad Shahidehpour,et al. Probabilistic reliability evaluation of power systems including wind turbine generators using a simplified multi-state model: A case study , 2009, 2009 IEEE Power & Energy Society General Meeting.
[9] R. Billinton,et al. A simplified wind power generation model for reliability evaluation , 2006, IEEE Transactions on Energy Conversion.
[10] Hannele Holttinen,et al. Current Methods to Calculate Capacity Credit of Wind Power, IEA Collaboration , 2008, 2008 IEEE Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century.