Priority algorithms for the subset-sum problem
暂无分享,去创建一个
[1] J. M. Moore. An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs , 1968 .
[2] Deeparnab Chakrabarty,et al. Knapsack Problems , 2008 .
[3] Hans Kellerer,et al. An efficient fully polynomial approximation scheme for the Subset-Sum Problem , 2003, J. Comput. Syst. Sci..
[4] K. Arrow. Social Choice and Individual Values , 1951 .
[5] Allan Borodin,et al. Priority Algorithms for Graph Optimization Problems , 2004, WAOA.
[6] Eugene Levner,et al. A Fast Approximation Algorithm For The Subset-Sum Problem , 1994 .
[7] Rafail Ostrovsky,et al. Approximation Algorithms for the Job Interval Selection Problem and Related Scheduling Problems , 2006, Math. Oper. Res..
[8] Christelle Guéret,et al. A new lower bound for the open‐shop problem , 1999, Ann. Oper. Res..
[9] Allan Borodin,et al. Priority algorithms for the subset-sum problem , 2008, J. Comb. Optim..
[10] David Pisinger. An exact algorithm for large multiple knapsack problems , 1999, Eur. J. Oper. Res..
[11] Laureano F. Escudero,et al. Coefficient reduction for knapsack-like constraints in 0-1 programs with variable upper bounds , 1990 .
[12] Amos Fiat,et al. On-line routing of virtual circuits with applications to load balancing and machine scheduling , 1997, JACM.
[13] Sudipto Guha,et al. Approximating the throughput of multiple machines under real-time scheduling , 1999, STOC '99.
[14] Paolo Toth,et al. A Framework for Tightening 0-1 Programs Based on Extensions of Pure 0-1 KP and SS Problems , 1995, IPCO.
[15] Alberto Caprara,et al. Worst-case analysis of the subset sum algorithm for bin packing , 2004, Oper. Res. Lett..
[16] K. Fine,et al. Social Choice and Individual Rankings II , 1974 .
[17] Allan Borodin,et al. Toward a Model for Backtracking and Dynamic Programming , 2005, Computational Complexity Conference.
[18] Russell Impagliazzo,et al. Models of Greedy Algorithms for Graph Problems , 2004, SODA '04.
[19] Oscar H. Ibarra,et al. Fast Approximation Algorithms for the Knapsack and Sum of Subset Problems , 1975, JACM.
[20] Rafail Ostrovsky,et al. Approximation algorithms for the job interval selection problem and related scheduling problems , 2001, Proceedings 2001 IEEE International Conference on Cluster Computing.
[21] Kazuo Iwama,et al. Removable Online Knapsack Problems , 2002, ICALP.
[22] Eugene Levner,et al. Fast approximation algorithms for knapsack type problems , 1980 .
[23] Allan Borodin,et al. On the Power of Priority Algorithms for Facility Location and Set Cover , 2002, APPROX.
[24] Rudolf Fleischer,et al. On‐line scheduling revisited , 2000 .
[25] David S. Johnson,et al. Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .
[26] Han Hoogeveen,et al. New Lower and Upper Bounds for Scheduling Around a Small Common Due Date , 1994, Oper. Res..
[27] Oded Regev. Priority algorithms for makespan minimization in the subset model , 2002, Inf. Process. Lett..
[28] Philippe Baptiste,et al. Polynomial time algorithms for minimizing the weighted number of late jobs on a single machine with equal processing times , 1999 .
[29] Paolo Toth,et al. Worst-case analysis of greedy algorithms for the subset-sum problem , 1984, Math. Program..
[30] Marek Chrobak,et al. A Note on Scheduling Equal-Length Jobs to Maximize Throughput , 2006, J. Sched..
[31] Paolo Toth,et al. Knapsack Problems: Algorithms and Computer Implementations , 1990 .
[32] Eugene L. Lawler,et al. Fast approximation algorithms for knapsack problems , 1977, 18th Annual Symposium on Foundations of Computer Science (sfcs 1977).
[33] Allan Borodin,et al. (Incremental) Priority Algorithms , 2002, SODA '02.
[34] Sudipto Guha,et al. Approximating the Throughput of Multiple Machines in Real-Time Scheduling , 2002, SIAM J. Comput..
[35] Frits C. R. Spieksma,et al. Interval selection: applications, algorithms and lower bounds , 2002 .