Applications of learning curves in production and operations management: A systematic literature review
暂无分享,去创建一个
Christoph H. Glock | Mohamad Y. Jaber | Eric H. Grosse | Timothy L. Smunt | M. Jaber | C. Glock | T. Smunt | E. Grosse
[1] Charles H. Fine. A Quality Control Model with Learning Effects , 1988, Oper. Res..
[2] T. Smunt. Incorporating learning curve analysis into medium-term capacity planning procedures: a simulation experiment , 1986 .
[3] Jeffrey D. Camm,et al. Modeling Synergy and Learning under Multiple Advanced Manufacturing Technologies , 1989 .
[4] T. C. Edwin Cheng,et al. Single-machine scheduling with deteriorating jobs and learning effects to minimize the makespan , 2007, Eur. J. Oper. Res..
[5] E. A. Hackett. Application of a set of learning curve models to repetitive tasks , 1983 .
[6] Randolph W. Hall,et al. Territory Planning and Vehicle Dispatching with Driver Learning , 2007, Transp. Sci..
[7] Maurice Bonney,et al. Optimal lot sizing under learning considerations: The bounded learning case , 1996 .
[8] Christoph H. Glock,et al. Production Economics and the Learning Curve: A Meta-Analysis , 2014 .
[9] J. H. Glover,et al. MANUFACTURING PROGRESS FUNCTIONS I. AN ALTERNATIVE MODEL AND ITS COMPARISON WITH EXISTING FUNCTIONS , 1965 .
[10] M. Jaber,et al. Vendor managed inventory (VMI) with consignment considering learning and forgetting effects , 2012 .
[11] Mohamad Y. Jaber,et al. An integrated supply chain model with errors in quality inspection and learning in production , 2014 .
[12] R. Nanda,et al. Quantity discounts using a joint lot size model under learning effects—multiple buyers case , 1993 .
[13] Robert E. Ployhart,et al. Learning by Doing Something Else: Variation, Relatedness, and the Learning Curve , 2003, Manag. Sci..
[14] G. R. Knecht,et al. Costing, Technological Growth and Generalized Learning Curves , 1974 .
[15] J. R. De Jong,et al. THE EFFECTS OF INCREASING SKILL ON CYCLE TIME AND ITS CONSEQUENCES FOR TIME STANDARDS , 1957 .
[16] Bertrand M. T. Lin,et al. A concise survey of scheduling with time-dependent processing times , 2004, Eur. J. Oper. Res..
[17] Walter Rohmert,et al. LEARNING OF COMPLEX MANUAL TASKS , 1966 .
[18] Nicholas Baloff,et al. Extension of the Learning Curve — Some Empirical Results , 1971 .
[19] Flávio Sanson Fogliatto,et al. Learning curve models and applications: Literature review and research directions , 2011 .
[20] Gur Mosheiov,et al. Scheduling problems with a learning effect , 2001, Eur. J. Oper. Res..
[21] Hamed Maleki,et al. Evaluation of scheduling using triangular whitenization functions , 2015 .
[22] Mohamed Mohamed Naim,et al. The dynamics of capacity planning for flexible manufacturing system startup , 1989 .
[23] Mohamad Y. Jaber,et al. A numerical comparison of three potential learning and forgetting models , 2004 .
[24] Maurice Bonney,et al. The economic manufacture/order quantity (EMQ/EOQ) and the learning curve: Past, present, and future , 1999 .
[25] F. Lévy. Adaptation in the Production Process , 1965 .
[26] N. Baloff,et al. Startup management , 1970 .
[27] Christoph H. Glock,et al. Systematic literature reviews in purchasing and supply management research: a tertiary study , 2012 .
[28] Christoph H. Glock,et al. The effect of worker learning on manual order picking processes , 2015 .
[29] Denis Royston Towill,et al. Management systems applications of learning curves and progress functions , 1985 .
[30] George Li,et al. The impact of quality on learning , 1997 .
[31] M. Jaber,et al. Coordinating a three-level supply chain with learning-based continuous improvement , 2010 .
[32] Nick T. Thomopoulos,et al. The Mixed Model Learning Curve , 1969 .
[33] D. R. Towill,et al. Transfer Functions and Learning Curves , 1976 .
[34] David P. Kopcso,et al. Learning curves and lot sizing for independent and dependent demand , 1983 .
[35] Timothy L. Smunt,et al. Log-linear and non-log-linear learning curve models for production research and cost estimation , 1999 .
[36] Avraham Shtub,et al. Modelling the effects of learning and job enlargement on assembly systems with parallel lines , 1988 .
[37] H. FlomJ,et al. The expanding scope of SEC disclosure laws. , 1974 .
[38] Meriem Ennigrou,et al. Scheduling problems under learning effects: classification and cartography , 2018, Int. J. Prod. Res..
[39] Avraham Shtub,et al. Learning and forgetting industrial skills: An experimental model , 1993 .
[40] C. Glock. The joint economic lot size problem: A review , 2012 .
[41] Tonya Boone,et al. Learning and Knowledge Depreciation in Professional Services , 2008, Manag. Sci..
[42] Gur Mosheiov,et al. Parallel machine scheduling with a learning effect , 2001, J. Oper. Res. Soc..
[43] Edieal J. Pinker,et al. The Efficiency-Quality Trade-Off of Cross-Trained Workers , 2000, Manuf. Serv. Oper. Manag..
[44] Mohamad Y. Jaber,et al. Managing yield by lot splitting in a serial production line with learning, rework and scrap , 2010 .
[45] S. Sikström,et al. The power integration diffusion model for production breaks. , 2002, Journal of experimental psychology. Applied.
[46] Maurice Bonney,et al. A comparative study of learning curves with forgetting , 1997 .
[47] Flávio Sanson Fogliatto,et al. Learning curve modelling of work assignment in mass customized assembly lines , 2007 .
[48] Paul S. Adler,et al. Shared learning , 1990 .
[49] H C Wiltshire,et al. The variation of cycle times with repetition for manual tasks. , 1967, Ergonomics.
[50] D. Tranfield,et al. Towards a Methodology for Developing Evidence-Informed Management Knowledge by Means of Systematic Review , 2003 .
[51] Salah E. Elmaghraby,et al. Economic manufacturing quantities under conditions of learning and forgetting (EMQ/LaF) , 1990 .
[52] Mohamad Y. Jaber,et al. Production , Manufacturing and Logistics Learning curves for processes generating defects requiring reworks , 2004 .
[53] Amiya K. Chakravarty. Line Balancing With Task Learning Effects , 1988 .
[54] Charles J. Teplitz,et al. The Learning Curve Deskbook: A Reference Guide to Theory, Calculations, and Applications , 1991 .
[55] Shlomo Globerson. Introducing the repetition pattern of a task into its learning curve , 1980 .
[56] M. Palmer Terrell,et al. Aggregate planning models incorporating productivity—an overview , 1982 .
[57] Dirk Biskup,et al. Single-machine scheduling with learning considerations , 1999, Eur. J. Oper. Res..
[58] Yasuo Yamane,et al. Developing a plant system prediction model for technology transfer , 2015 .
[59] Gwo-Liang Liao,et al. Optimum policy for a production system with major repair and preventive maintenance , 2012 .
[60] Terry P. Harrison,et al. Optimising lot sizing and order scheduling with non-linear production rates , 2010 .
[61] Vicente Salas-Fumás,et al. Learning to learn and productivity growth: Evidence from a new car-assembly plant , 2013 .
[62] Mohamad Y. Jaber,et al. Learning curves for imperfect production processes with reworks and process restoration interruptions , 2008, Eur. J. Oper. Res..
[63] D. Mowery,et al. Process Innovation and Learning by Doing in Semiconductor Manufacturing , 1998 .
[64] Mohamad Y. Jaber,et al. Countering forgetting through training and deployment , 2003 .
[65] Finn Wynstra,et al. What did we do, who did it and did it matter? A review of fifteen volumes of the (European) Journal of Purchasing and Supply Management , 2010 .
[66] E. H. Grosse,et al. Decision support models for supplier development: systematic literature review and research agenda , 2017 .
[67] Hongzhong Huang,et al. Optimal reliability, warranty and price for new products , 2007 .
[68] Jie Zhang,et al. A multi-factor revision based analysis of the personnel operational capacity of aircraft assembly lines , 2015 .
[69] Dmitrij Slepniov,et al. Management of the learning curve: A case of overseas production capacity expansion , 2016 .
[70] Giovanni Mummolo,et al. The effect of dynamic worker behavior on flow line performance , 2009 .
[71] Fiorenzo Franceschini,et al. An empirical investigation of learning curve composition laws for quality improvement in complex manufacturing plants , 2004 .
[72] John B. Jensen,et al. Learning and labour assignment in a dual resource constrained cellular shop , 2004 .
[73] Christoph H. Glock,et al. An experimental investigation of learning effects in order picking systems (angenommen) , 2013 .
[74] J. H. Glover. MANUFACTURING PROGRESS FUNCTIONS III. PRODUCTION CONTROL OF NEW PRODUCTS , 1967 .
[75] Moutaz Khouja. The use of minor setups within production cycles to improve product quality and yield , 2005, Int. Trans. Oper. Res..
[76] Ojelanki K. Ngwenyama,et al. A comparative analysis of learning curves: Implications for new technology implementation management , 2010, Eur. J. Oper. Res..
[77] Timothy L. Smunt,et al. Improving operations planning with learning curves: overcoming the pitfalls of ‘messy’ shop floor data , 2003 .
[78] Christoph H. Glock,et al. The Lot Sizing Problem: A Tertiary Study , 2014 .
[79] J. H. Glover,et al. MANUFACTURING PROGRESS FUNCTIONS II. SELECTION OF TRAINEES AND CONTROL OF THEIR PROGRESS , 1966 .
[80] R. Ebert. Aggregate Planning with Learning Curve Productivity , 1976 .
[81] Denis Royston Towill,et al. PREDICTION OF OPERATOR PERFORMANCE DURING LEARNING OF REPETITIVE TASKS , 1970 .
[82] Kevin J. Dooley,et al. Supplier innovativeness, organizational learning styles and manufacturer performance: An empirical assessment , 2010 .
[83] T. P. Wright,et al. Factors affecting the cost of airplanes , 1936 .
[84] Mario Vanhoucke,et al. Influence of learning in resource-constrained project scheduling , 2015, Comput. Ind. Eng..
[85] Yan Dong,et al. Supply Chain Learning and Spillovers in Vendor Managed Inventory , 2012, Decis. Sci..
[86] Behrokh Khoshnevis,et al. Production rate, learning, and program costs: Survey and bibliography , 1987 .
[87] Christoph H. Glock,et al. Machine scheduling problems in production: A tertiary study , 2017, Comput. Ind. Eng..
[88] Kannan Srinivasan,et al. Modifying Customer Expectations of Price Decreases for a Durable Product , 1998 .
[89] Maurice Bonney,et al. The effects of learning and forgetting on the optimal lot size quantity of intermittent production runs , 1998 .
[90] Maurice Bonney,et al. Production breaks and the learning curve: The forgetting phenomenon , 1996 .
[91] Yu-Chung Tsao,et al. Effects of promotion cost sharing policy with the sales learning curve on supply chain coordination , 2012, Comput. Oper. Res..
[92] Andrew P. McAfee. THE IMPACT OF ENTERPRISE INFORMATION TECHNOLOGY ADOPTION ON OPERATIONAL PERFORMANCE: AN EMPIRICAL INVESTIGATION , 2002 .
[93] Adam Janiak,et al. Scheduling jobs with position-dependent processing times , 2004, J. Oper. Res. Soc..
[94] Ramsey F. Hamade,et al. Analyzing CAD competence with univariate and multivariate learning curve models , 2009, Comput. Ind. Eng..
[95] S. Goyal,et al. Economic production quantity model for items with imperfect quality subject to learning effects , 2008 .
[96] C. Bailey. Forgetting and the learning curve: a laboratory study , 1989 .
[97] John F. Muth,et al. Search Theory and the Manufacturing Progress Function , 1986 .
[98] Timothy L. Smunt. A COMPARISON OF LEARNING CURVE ANALYSIS AND MOVING AVERAGE RATIO ANALYSIS FOR DETAILED OPERATIONAL PLANNING , 1986 .
[99] Tarald O. Kvålseth,et al. The effect of task complexity on the human learning function , 1978 .
[100] Woody M. Liao. EFFECTS OF LEARNING ON RESOURCE ALLOCATION DECISIONS , 1979 .
[101] H. Ebbinghaus. Uber das Gedachtnis , 1996 .
[102] Antony R Mileham,et al. Modelling human performance within an automotive engine assembly line , 2013 .
[103] Adedeji Badiru,et al. Multivariate analysis of the effect of learning and forgetting on product quality , 1995 .
[104] D. Tranfield,et al. Producing a systematic review. , 2009 .
[105] Charles H. Fine. Quality Improvement and Learning in Productive Systems , 1986 .
[106] David A. Nembhard,et al. The Effects of Worker Learning, Forgetting, and Heterogeneity on Assembly Line Productivity , 2001, Manag. Sci..
[107] Kirk R. Karwan,et al. Production lot sizing under setup and worker learning , 1988 .
[108] Christoph H. Glock,et al. A learning curve for tasks with cognitive and motor elements , 2013, Comput. Ind. Eng..
[109] G. Nadler,et al. MANUFACTURING PROGRESS FUNCTIONS FOR TYPES OF PROCESSES , 1963 .
[110] Mohamad Y. Jaber,et al. Inventory models for imperfect quality items with shortages and learning in inspection , 2012 .
[111] Avraham Shtub,et al. The Impact of Breaks on Forgetting When Performing A Repetitive Task , 1989 .
[112] Denis Royston Towill,et al. Learning performance of an industrial long cycle time group task , 1980 .
[113] C. Pegels. On Startup or Learning Curves: An Expanded View , 1969 .
[114] Avraham Shtub,et al. THE EFFECT OF LEARNING ON THE OPERATION OF MIXED-MODEL ASSEMBLY LINES , 2009 .
[115] Kofi Kissi Dompere,et al. Learning by doing and optimal factor demand , 1991 .
[116] J. E. Mazur,et al. Learning as accumulation: a reexamination of the learning curve. , 1978, Psychological bulletin.
[117] Gur Mosheiov,et al. Scheduling with general job-dependent learning curves , 2003, Eur. J. Oper. Res..
[118] Denis Royston Towill,et al. A direct method for the determination of learning curve parameters from historical data , 1973 .
[119] C. Glock,et al. Literature reviews in supply chain management: a tertiary study , 2015 .
[120] Mustafa Uzumeri,et al. Experiential learning and forgetting for manual and cognitive tasks , 2000 .
[121] Mohamad Y. Jaber,et al. Production planning in DRC systems considering worker performance , 2015, Comput. Ind. Eng..
[122] Evan L. Porteus. Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction , 1986, Oper. Res..
[123] T. C. Edwin Cheng,et al. Some scheduling problems with deteriorating jobs and learning effects , 2008, Comput. Ind. Eng..
[124] Flávio Sanson Fogliatto,et al. Learning dependent job scheduling in mass customized scenarios considering ergonomic factors , 2014 .
[125] Mohamad Y. Jaber,et al. An economic production and remanufacturing model with learning effects , 2011 .
[126] Randolph Kirchain,et al. A dynamic process-based cost modeling approach to understand learning effects in manufacturing , 2010 .
[127] Christos Koulamas,et al. Single-machine and two-machine flowshop scheduling with general learning functions , 2007, Eur. J. Oper. Res..
[128] Manoj K. Malhotra,et al. Acquiring and operationalizing worker flexibility in dual resource constrained job shops with worker transfer delays and learning losses , 1994 .
[129] Mustafa Uzumeri,et al. A population of learners: A new way to measure organizational learning , 1998 .
[130] J. Alberto Espinosa,et al. Learning from Experience in Software Development: A Multilevel Analysis , 2007, Manag. Sci..
[131] I. Steedman. SOME IMPROVEMENT CURVE THEORY , 1970 .
[132] Guoqing Wang,et al. Single Machine Scheduling with Learning Effect Considerations , 2000, Ann. Oper. Res..
[133] Eric H. Grosse,et al. Celebrating the 10th volume of IJISM: a bibliographic review and outlook , 2017 .
[134] Timothy L. Smunt. Rough cut capacity planning in a learning environment , 1996 .
[135] Adedeji Badiru,et al. Computational survey of univariate and multivariate learning curve models , 1992 .
[136] Mohamad Y. Jaber,et al. The Depletion-Power-Integration-Latency (DPIL) model of spaced and massed repetition , 2012, Comput. Ind. Eng..
[137] L. Demeester,et al. Managing learning resources for consecutive product generations , 2005 .
[138] Nima Hamta,et al. A hybrid PSO algorithm for a multi-objective assembly line balancing problem with flexible operation times, sequence-dependent setup times and learning effect , 2013 .
[139] Dirk Biskup,et al. A state-of-the-art review on scheduling with learning effects , 2008, Eur. J. Oper. Res..
[140] Ji-Bo Wang,et al. Single-machine scheduling problems with the effects of learning and deterioration , 2007 .
[141] Louis E. Yelle. THE LEARNING CURVE: HISTORICAL REVIEW AND COMPREHENSIVE SURVEY , 1979 .
[142] David A. Nembhard,et al. An empirical comparison of forgetting models , 2001, IEEE Trans. Engineering Management.
[143] Dar-Li Yang,et al. Minimizing the total completion time in a single-machine scheduling problem with a time-dependent learning effect , 2006, Eur. J. Oper. Res..
[144] Everett E. Adam,et al. Examining the Impact of Speed of Quality Improvement on Quality‐Related Costs , 1996 .
[145] Rajiv Kohli,et al. Learning curves in collaborative planning, forecasting, and replenishment (CPFR) information systems: An empirical analysis from a mobile phone manufacturer , 2013 .
[146] Luk N. Van Wassenhove,et al. Behind the Learning Curve: Linking Learning Activities to Waste Reduction , 2000 .
[147] Mohamad Y. Jaber,et al. Learning and forgetting models and their applications , 2013 .
[148] E. B. Cochran,et al. Predicting new product labour hours , 1982 .
[149] Maurice Bonney,et al. Lot sizing with learning and forgetting in set-ups and in product quality , 2003 .
[150] Ezey M. Dar-El,et al. A dual-phase model for the individual learning process in industrial tasks , 1995 .