Reforging construction supply chains:: a source selection perspective

Abstract Establishing synergistic supply chains in general and optimizing source selection in particular play a significant role in the overall success of any construction project. The generic objective of the source selection process is to identify a ‘capable’ source from among those ‘competent’ and ‘credible’ applicants whose performance can be expected to best meet the clients’ requirements at an affordable and optimal cost. This paper examines relevant selection processes along different construction supply chain routes such as ‘design-bid-build’, ‘design-build’, ‘design-build-maintain’, ‘design-build-operate’ and ‘build-operate-transfer’. A cross-section of different source selection practices by various clients is also provided for benchmarking and improving current practices, for example, towards enhanced value across each link of the supply chain.

[1]  Gary David Holt,et al.  WHICH CONTRACTOR SELECTION METHODOLOGY , 1998 .

[2]  Paul Humphreys,et al.  A just‐in‐time evaluation strategy for international procurement , 1998 .

[3]  Akintola Akintoye,et al.  Risk analysis and management of Private Finance Initiative projects , 1998 .

[4]  Leonhard E. Bernold,et al.  Vendor analysis for best buy in construction , 1991 .

[5]  Peter E.D. Love,et al.  Concurrent engineering : a strategy for procuring construction projects , 1998 .

[6]  Pietro Romano,et al.  Supply chain management: an analytical framework for critical literature review , 2000 .

[7]  Kimberly J. Falcone Newsletters That Deliver , 1999 .

[8]  Jahidul Alum,et al.  Distinctive winning elements in BOT tender , 1997 .

[9]  Gary David Holt,et al.  Tendering procedures, contractual arrangements and Latham: the contractors' view , 1996 .

[10]  S. V. Narasimham,et al.  Discussion: CSFs in Competitive Tendering and Negotiation Model for BOT Projects , 1998 .

[11]  Martin Skitmore,et al.  Criteria for contractor selection , 1997 .

[12]  Ekambaram Palaneeswaran,et al.  Dynamic contractor prequalification , 1999 .

[13]  Nigel J. Smith,et al.  Decision-makers' perceptions in the formulation of prequalification criteria , 1999 .

[14]  Mohan M. Kumaraswamy,et al.  Contractor evaluation and selection: a Hong Kong perspective , 1996 .

[15]  Chimay J. Anumba,et al.  Concurrent engineering in design-build projects , 1997 .

[16]  C. C. LI,et al.  A new measure for supplier performance evaluation , 1997 .

[17]  Christopher M. Gordon,et al.  Choosing Appropriate Construction Contracting Method , 1994 .

[18]  R. Tiong CSFs in Competitive Tendering and Negotiation Model for BOT Projects , 1996 .

[19]  Ekambaram Palaneeswaran,et al.  Contractor Selection for Design/Build Projects , 2000 .

[20]  Gary David Holt,et al.  Evaluating performance potential in the selection of construction contractors , 1994 .

[21]  Martin Skitmore,et al.  Which procurement system? Towards a universal procurement selection technique , 1988 .

[22]  Robert L. K. Tiong,et al.  Evaluation and Competitive Tendering of BOT Power Plant Project in China , 1998 .

[23]  Mohan M. Kumaraswamy,et al.  Linking procurement systems to project priorities , 1998 .

[24]  Zedan Hatush,et al.  Evaluating contractor prequalification data: selection criteria and project success factors , 1997 .

[25]  Andrew Edkins,et al.  Constructors' Key Guide to PFI , 1998 .

[26]  George Norman,et al.  The role of logistics in the materials flow control process , 1998 .

[27]  Weiguo Song,et al.  COMPETITIVE TENDERING PRACTICE IN CHINESE CONSTRUCTION , 1998 .

[28]  Jeffrey S. Russell,et al.  Constructor Prequalification: Choosing the Best Constructor and Avoiding Constructor Failure , 1996 .

[29]  C. Harland Supply Chain Management: Relationships, Chains and Networks , 1996 .

[30]  R. Tiong,et al.  Critical Success Factors in Winning BOT Contracts , 1992 .

[31]  Lars-Erik Gadde,et al.  The Changing Role of Purchasing - Reconsidering three strategic issues , 1994 .

[32]  E. Palaneeswaran,et al.  A fresh approach to improve quality in design-build projects , 1999 .

[33]  Mohan M. Kumaraswamy,et al.  Governmental role in BOT-led infrastructure development , 2001 .

[34]  Christopher W. Allinson,et al.  The Implications of Learning Styles for Training and Development: A Discussion of the Matching Hypothesis , 1996 .

[35]  Martin Skitmore,et al.  Assessment and evaluation of contractor data against client goals using PERT approach , 1997 .

[36]  Ekambaram Palaneeswaran,et al.  Recent advances and proposed improvements in contractor prequalification methodologies , 2001 .

[37]  L. V. D. Wegen,et al.  Outranking methods in support of supplier selection , 1998 .