Leaner Construction Through Off-Site Manufacturing
暂无分享,去创建一个
[1] Iris D. Tommelein,et al. Contribution of Specialty Contractor Knowledge to Early Design , 2000 .
[2] Stuart D. Green. The future of lean construction: a brave new world , 2000 .
[3] Glenn Ballard,et al. Problems in the Interface Between Mechanical Design and Construction: A Research Proposal , 2001 .
[4] Daniel T. Jones,et al. The machine that changed the world : based on the Massachusetts Institute of Technology 5-million dollar 5-year study on the future of the automobile , 1990 .
[5] Brychan Thomas,et al. HARMONIZATION BETWEEN MAIN CONTRACTORS AND SUBCONTRACTORS: A PREREQUISITE FOR LEAN CONSTRUCTION? , 2002 .
[6] Christine Pasquire. Early incorporation of specialist design capability , 1994 .
[7] Stuart D. Green. THE HUMAN RESOURCE MANAGEMENT IMPLICATIONS OF LEAN CONSTRUCTION: CRITICAL PERSPECTIVES AND CONCEPTUAL CHASMS , 2002 .
[8] Glenn Ballard,et al. EARNED VALUE METHOD AND CUSTOMER EARNED VALUE , 2002 .
[9] Peter Sleegers,et al. A Bridge to the Future , 2001 .