Development of Consultant Performance Measures for Design Projects

Measurement is an essential step in any control process. Performance is reflected by measures upon which corrective actions are suggested and taken; however, measures in organizations are often poorly designed and utilized. More specifically, many consultant performances are not at satisfactory levels. This paper presents consultant performance measures of deliverables, work process, and cost/schedule, and proposes a systematic measurement framework. Measures were tested on 8 design projects and their applicability was ensured. These measures can be used to disclose areas of excellent and poor performance in both the work process and results, to allow project participants to focus attention, and to address performance at the desired levels and aspects. One benefit of this research is the potential to improve the efficacy of public projects where consultants are used.

[1]  Alexander Laufer,et al.  Factors Affecting Construction‐Planning Outcomes , 1990 .

[2]  Michael White Performance Criteria and Incentive systems , 1985 .

[3]  Mohan M. Kumaraswamy,et al.  Systematizing Construction Project Evaluations , 1996 .

[4]  Charles T. Jahren,et al.  Journal of Construction Engineering and Management , 1983 .

[5]  Michael Coyle,et al.  Critical Success Factors for Construction Projects , 1992 .

[6]  W. Duncan A GUIDE TO THE PROJECT MANAGEMENT BODY OF KNOWLEDGE , 1996 .

[7]  Kenneth J. Barlow Effective Management of Engineering Design , 1981 .

[8]  Robert D McIlhattan,et al.  The Ernst & Young Guide to Total Cost Management , 1992 .

[9]  Amy W. Gatian Is user satisfaction a valid measure of system effectiveness? , 1994, Inf. Manag..

[10]  Thomas J. Willoughby Managing Design Under Lump-Sum Contract , 1995 .

[11]  Neil N. Eldin Management of Engineering/Design Phase , 1991 .

[12]  Richard L. Tucker,et al.  FORECASTING DESIGN-RELATED PROBLEMS - CASE STUDY , 1991 .

[13]  D. Campbell Task Complexity: A Review and Analysis , 1988 .

[14]  Stuart D. Anderson,et al.  Improving Project Management of Design , 1994 .

[15]  R. Kaplan,et al.  The balanced scorecard--measures that drive performance. , 2015, Harvard business review.

[16]  Lansford C. Bell,et al.  Measuring Effectiveness of Materials Management Process , 1995 .

[17]  Francis Hartman,et al.  More-Stable Owner-Contractor Relationships , 1996 .

[18]  B. Steele For More Information , 2000, Journal of the National Cancer Institute.

[19]  Andrzej S. Nowak Modeling human error in structural design and construction : proceedings of a workshop sponsored by the National Science Foundation, Ann Arbor, Michigan, June 4-6, 1986 , 1986 .

[20]  null null,et al.  Constructability and Constructability Programs: White Paper , 1991 .