A Load-based and Due-date-oriented Approach to Order Review/Release in Job Shops

In this paper, a new order review/release (ORR) method is proposed for shop floor control systems. The proposed method utilizes both job due date and shop load information to improve the effectiveness of the ORR function in production systems. The performance of the new method is compared to those of a few well-known ORR methods under four experimental conditions. The results of extensive simulation experiments indicate that the proposed method is superior with respect to the mean absolute deviation measure. In general, it is also better than existing methods for the other performance measures. Furthermore, we show that the proposed method is more robust to variations in system load and processing times than the other ORR methods examined.

[1]  Linda Hendry,et al.  Alternative order release mechanisms: a comparison by simulation , 1994 .

[2]  Warren W. Fisher,et al.  Due Date Assignment, Job Order Release, and Sequencing Interaction in Job Shop Scheduling* , 1992 .

[3]  Richard H. Deane,et al.  A Loading and Balancing Methodology for Job Shop Control , 1974 .

[4]  William L. Berry,et al.  Manufacturing Planning and Control Systems , 1984 .

[5]  Randall P. Sadowski,et al.  Introduction to Simulation Using Siman , 1990 .

[6]  Karl-Werner Hansmann Capacity Oriented Production Control for a Job Shop Production , 1993 .

[7]  Don T. Phillips,et al.  A comparison of order release strategies in production control systems , 1992 .

[8]  Yavuz A. Bozer,et al.  Which one is responsible for WIP: the workstations or the material handling system? , 1992 .

[9]  Wolfgang Bechte Load-oriented manufacturing control just-in-time production for job shops , 1994 .

[10]  John B. Jensen,et al.  An Evaluation of Capacity Sensitive Order Review and Release Procedures in Job Shops , 1993 .

[11]  Lawrence D. Fredendall,et al.  Information and scheduling in a dual resource constrained job shop , 1996 .

[12]  Vincent A. Mabert,et al.  AN EVALUATION OF ORDER RELEASE MECHANISMS IN A JOB-SHOP ENVIRONMENT , 1988 .

[13]  V. Barnett,et al.  Applied Linear Statistical Models , 1975 .

[14]  Robert M. O'Keefe,et al.  An order release mechanism for a flexible flow system , 1995 .

[15]  Lawrence D. Fredendall,et al.  Load smoothing by the planning and order review/release systems: A simulation experiment , 1991 .

[16]  Timothy D. Fry,et al.  Capacity-based order review/release strategies to improve manufacturing performance , 1992 .

[17]  R. Deal Simulation Modeling and Analysis (2nd Ed.) , 1994 .

[18]  Reha Uzsoy,et al.  Scheduling and order release in a single-stage production system , 1995 .

[19]  Farzad Mahmoodi,et al.  An evaluation of order releasing and due date assignment heuristics in a cellular manufacturing system , 1990 .

[20]  Robert M. O'Keefe,et al.  Order Release in Automated Manufacturing Systems , 1995 .

[21]  Steven A. Melnyk,et al.  ORDER REVIEW/RELEASE AND ITS IMPACT ON THE SHOP FLOOR. , 1988 .

[22]  Hans-Peter Wiendahl,et al.  Application of load-oriented manufacturing control in industry , 1992 .

[23]  Kenneth R. Baker,et al.  The effects of input control in a simple scheduling model , 1984 .

[24]  Garvin W Patterson,et al.  An input / output-control system , 1976 .

[25]  P. M. Bobrowski,et al.  Work release strategies in a dual resource constrained job shop , 1989 .

[26]  R.-K. Li,et al.  Integrating order release control with due-date assignment rules , 1997 .

[27]  Ihsan Sabuncuoglu,et al.  Analysis of order review/release problems in production systems , 1999 .

[28]  Brian G. Kingsman,et al.  Job Release: Part of a Hierarchical System to Manage Manufacturing Lead Times in Make-to-order Companies , 1991 .

[29]  Steven A. Melnyk,et al.  Order review/release: research issues and perspectives , 1989 .

[30]  Wolfgang Bechte Theory and practice of load-oriented manufacturing control , 1988 .

[31]  J. J. Kanet Load-limited order release in job shop scheduling systems , 1988 .

[32]  Stephen C. Graves,et al.  A Review of Production Scheduling , 1981, Oper. Res..

[33]  Wolter J. Fabrycky,et al.  An Input/Output Control System For The Dynamic Job Shop , 1987 .

[34]  Paul M. Bobrowski Implementing a loading heuristic in a discrete release job shop , 1989 .

[35]  D. R. Denzler,et al.  Evaluating variance control, order review/release and dispatching: a regression analysis , 1994 .