A decomposition based solution algorithm for U-type assembly line balancing with interval data
暂无分享,去创建一个
[1] Jeonghan Ko,et al. Robust manufacturing line design with controlled moderate robustness in bottleneck buffer time to manage stochastic inter-task times , 2013 .
[2] Marc J. Schniederjans,et al. U-OPT: An analysis of exact U-shaped line balancing procedures , 2003 .
[3] Ihsan Sabuncuoglu,et al. Balancing of U-type assembly systems using simulated annealing , 2001 .
[4] J RosenblattMeir,et al. Note. Optimal Balancing of U-Shaped Assembly Lines , 1998 .
[5] Mohammed Fazle Baki,et al. Balancing transfer lines using Benders decomposition and ant colony optimisation techniques , 2014 .
[6] Vittorio Maniezzo,et al. Benders decomposition, Lagrangean relaxation and metaheuristic design , 2009, J. Heuristics.
[7] Armin Scholl,et al. State-of-the-art exact and heuristic solution procedures for simple assembly line balancing , 2006, Eur. J. Oper. Res..
[8] Marielle Christiansen,et al. The robust vehicle routing problem with time windows , 2013, Comput. Oper. Res..
[9] A Gerodimos,et al. Robust Discrete Optimization and its Applications , 1996, J. Oper. Res. Soc..
[10] Jessica Schulze,et al. Balancing And Sequencing Of Assembly Lines , 2016 .
[11] Melvyn Sim,et al. Robust discrete optimization and network flows , 2003, Math. Program..
[12] Alexandre Dolgui,et al. Stability measure for a generalized assembly line balancing problem , 2013, Discret. Appl. Math..
[13] Timothy L. Urban,et al. Note. Optimal Balancing of U-Shaped Assembly Lines , 1998 .
[14] Rakesh Nagi,et al. Robust supply chain design under uncertain demand in agile manufacturing , 2010, Comput. Oper. Res..
[15] Ihsan Sabuncuoglu,et al. Ant colony optimization for the single model U-type assembly line balancing problem , 2009 .
[16] John Miltenburg,et al. U-shaped production lines: A review of theory and practice , 2001 .
[17] Nils Boysen,et al. A classification of assembly line balancing problems , 2007, Eur. J. Oper. Res..
[18] Alexandre Dolgui,et al. Scenario based robust line balancing: Computational complexity , 2012, Discret. Appl. Math..
[19] Alexandre Dolgui,et al. Scenario Based Robust Line Balancing , 2010 .
[20] Andreas C. Nearchou,et al. A meta-heuristic algorithm for the fuzzy assembly line balancing type-E problem , 2013, Comput. Oper. Res..
[21] Wen-Chyuan Chiang,et al. An optimal piecewise-linear program for the U-line balancing problem with stochastic task times , 2006, Eur. J. Oper. Res..
[22] Alexandre Dolgui,et al. Stability analysis of an optimal balance for an assembly line with fixed cycle time , 2006, Eur. J. Oper. Res..
[23] DolguiAlexandre,et al. Assembly line balancing under uncertainty , 2013 .
[24] John Miltenburg,et al. The stochastic U‐line balancing problem , 2003 .
[25] Armin Scholl,et al. ULINO: Optimally balancing U-shaped JIT assembly lines , 1999 .
[26] Erdal Erel,et al. Robust optimization models for the discrete time/cost trade-off problem , 2011 .
[27] Alexandre Dolgui,et al. A taxonomy of line balancing problems and their solutionapproaches , 2013 .
[28] Marc J. Schniederjans,et al. U-shaped assembly line layouts and their impact on labor productivity: An experimental study , 2004, Eur. J. Oper. Res..
[29] Igor Averbakh,et al. Exact and heuristic algorithms for the interval data robust assignment problem , 2011, Comput. Oper. Res..
[30] Alexandre Dolgui,et al. Robust balancing of straight assembly lines with interval task times , 2013, J. Oper. Res. Soc..
[31] B. Micieta,et al. Assembly Line Balancing , 2011 .
[32] Nils Boysen,et al. Assembly line balancing: Which model to use when? , 2006 .
[33] Arkadi Nemirovski,et al. Robust solutions of Linear Programming problems contaminated with uncertain data , 2000, Math. Program..
[34] J. Wijngaard,et al. The U-line balancing problem , 1994 .
[35] Alexandre Dolgui,et al. Assembly line balancing under uncertainty: Robust optimization models and exact solution method , 2013, Comput. Ind. Eng..
[36] Martin W. P. Savelsbergh,et al. Integer-Programming Software Systems , 2005, Ann. Oper. Res..
[37] Armin Scholl,et al. Balancing and Sequencing of Assembly Lines , 1995 .
[38] Alexandre Dolgui,et al. Supply Chain Engineering , 2010 .
[39] Oded Berman,et al. A Heuristic with Worst-case Analysis for Minimax Routing of Two Travelling Salesmen on a Tree , 1996, Discret. Appl. Math..
[40] Mohamed Haouari,et al. Discrete time/cost trade-off problem: A decomposition-based solution algorithm for the budget version , 2010, Comput. Oper. Res..
[41] Wen-Chyuan Chiang,et al. The stochastic U-line balancing problem: A heuristic procedure , 2006, Eur. J. Oper. Res..
[42] Jacques F. Benders,et al. Partitioning procedures for solving mixed-variables programming problems , 2005, Comput. Manag. Sci..
[43] Joaquín Bautista,et al. A robustness information and visualization model for time and space assembly line balancing under uncertain demand , 2013 .