100-kV feedthrough for the Indian Test Facility (INTF) — design and analysis
暂无分享,去创建一个
C. Rotti | Arun Chakraborty | M. Bandyopadhyay | D. Parmar | G. Bansal | J. Joshi | Sejal Shah | G. Bansal | M. Bandyopadhyay | D. Sharma | J. Joshi | C. Rotti | A. Chakraborty | D. Parmar | Sejal Shah | D. Sharma
[1] C. Rotti,et al. Diagnostic neutral beam for ITER - Concept to engineering , 2009, 2009 23rd IEEE/NPSS Symposium on Fusion Engineering.
[2] C. Rotti,et al. An Indian test facility to characterise diagnostic neutral beam for ITER , 2011 .
[3] C. Walker,et al. Status of the DNB based ITER CXRS and BES diagnostic , 2006 .
[4] C. Rotti,et al. Beamline Optimization for 100-keV Diagnostic Neutral Beam Injector for ITER , 2010, IEEE Transactions on Plasma Science.