Two-layer scheduling scheme for pump stations

In this paper, a two-layer scheduling scheme for pump stations in a water distribution network has been proposed. The upper layer, which works in one-hour sampling time, uses Model Predictive Control (MPC) to produce continuous flow set-points for the lower layer. While in the lower layer, a scheduling algorithm has been used to translate the continuous flow set-points to a discrete (ON-OFF) control operation sequence of the pump stations with the constraints that pump stations should draw the same amount of water as the continuous flow set-points provided by the upper layer. The tuning parameters of such algorithm are the lower layer control sampling period and the number of parallel pumps in the pump station. The proposed method has been tested in the Richmond case study.

[1]  Hossam Abdelmeguid Pressure, leakage and energy management in water distribution systems , 2011 .

[2]  James B. Rawlings,et al.  Postface to “ Model Predictive Control : Theory and Design ” , 2012 .

[3]  G. Cembranoa,et al.  Optimal control of urban drainage systems . A case study , 2009 .

[4]  Gabriela Cembrano,et al.  Optimal control of urban drainage systems. A case study , 2004 .

[5]  C. Ocampo‐Martinez,et al.  Application of predictive control strategies to the management of complex networks in the urban water cycle [Applications of Control] , 2013, IEEE Control Systems.

[6]  Kevin E Lansey,et al.  Optimal Control of Water Supply Pumping Systems , 1994 .

[7]  Larry W. Mays Urban Stormwater Management Tools , 2003 .

[8]  R. Stephenson A and V , 1962, The British journal of ophthalmology.

[9]  Vicenç Puig,et al.  Learning-based tuning of supervisory model predictive control for drinking water networks , 2013, Eng. Appl. Artif. Intell..

[10]  David Q. Mayne,et al.  Constrained model predictive control: Stability and optimality , 2000, Autom..

[11]  Jan M. Maciejowski,et al.  Predictive control : with constraints , 2002 .

[12]  Alberto Bemporad,et al.  Hierarchical and decentralised model predictive control of drinking water networks: Application to Barcelona case study , 2012 .

[13]  Vicenç Puig,et al.  Combining CSP and MPC for the Operational Control of Water Networks Application to the Richmond Case Study , 2014 .

[14]  W. Marsden I and J , 2012 .

[15]  M. A. Brdys,et al.  Operational Control of Water Systems: Structures, Algorithms, and Applications , 1994 .