Using AHP and the IPMA Competence Baseline in the project managers selection process

This paper proposes the joint use of the AHP (Analytic Hierarchy Process) and the ICB (IPMA Competence Baseline), as a tool for the decision-making process of selecting the most suitable managers for projects. A hierarchical structure, comprising the IPMA’s ICB 3.0 contextual, behavioural and technical competence elements, is constructed for the selection of project managers. It also describes the AHP implementation, illustrating the whole process with an example using all the 46 ICB competence elements as model criteria. This tool can be of high interest to decision-makers because it allows comparing the candidates for managing a project using a systematic and rigorous process with a rich set of proven criteria.

[1]  I-Tung Yang,et al.  Multiobjective optimization for manpower assignment in consulting engineering firms , 2011, Appl. Soft Comput..

[2]  M. Bohanec,et al.  The Analytic Hierarchy Process , 2004 .

[3]  Luis G. Vargas,et al.  Decision Making with the Analytic Network Process: Economic, Political, Social and Technological Applications with Benefits, Opportunities, Costs and Risks , 2013 .

[4]  Walter J. Gutjahr,et al.  Multi-objective decision analysis for competence-oriented project portfolio selection , 2010, Eur. J. Oper. Res..

[5]  Rafael Caballero,et al.  Solving a comprehensive model for multiobjective project portfolio selection , 2010, Comput. Oper. Res..

[6]  Xiaowei Xu,et al.  Multi-criteria decision making approaches for supplier evaluation and selection: A literature review , 2010, Eur. J. Oper. Res..

[7]  Nachiappan Subramanian,et al.  A review of applications of Analytic Hierarchy Process in operations management , 2012 .

[8]  José María Moreno-Jiménez,et al.  An AHP-multicriteria suitability evaluation of technological diversification in the automotive industry , 2012 .

[9]  Edmundas Kazimieras Zavadskas,et al.  Multiple Criteria Decision Support System for Assessment of Projects Managers in Construction , 2012, Int. J. Inf. Technol. Decis. Mak..

[10]  Wen-Yau Liang,et al.  The analytic hierarchy process in project evaluation , 2003 .

[11]  J. Turner,et al.  Project Categorization Systems: Aligning Capability With Strategy for Better Results , 2005 .

[12]  Kenneth H. Rose,et al.  Book Review: A Guide to the Project Management Body of Knowledge (PMBOK® Guide), Fourth Edition , 2001 .

[13]  Catherine M. Beise,et al.  Do project managers practice what they preach, and does it matter to project success? , 2010 .

[14]  Eddie John Fisher,et al.  What practitioners consider to be the skills and behaviours of an effective people project manager , 2011 .

[15]  R. Müller,et al.  Matching the project manager’s leadership style to project type , 2007 .

[16]  Tsung-Sheng Chang,et al.  Selection criteria of recruitment for information systems employees: Using the analytic hierarchy process (AHP) method , 2011 .

[17]  R. Müller,et al.  The Influence of Project Managers on Project Success Criteria and Project Success by Type of Project , 2007 .

[18]  Dimitris Askounis,et al.  Support managers' selection using an extension of fuzzy TOPSIS , 2011, Expert Syst. Appl..

[19]  Young Hoon Kwak,et al.  Analyzing project management research: Perspectives from top management journals , 2009 .

[20]  Dietmar P. F. Möller,et al.  The Automotive Industry , 2019, Guide to Automotive Connectivity and Cybersecurity.

[21]  R. Müller,et al.  Leadership competency profiles of successful project managers , 2010 .

[22]  Fabio De Felice Research and applications of AHP/ANP and MCDA for decision making in manufacturing , 2012 .

[23]  Marcello Braglia,et al.  Application of the AHP methodology in making a proposal for a public work contract , 2006 .

[24]  Axelos Managing Successful Projects with PRINCE2 , 2009 .

[25]  Siamak Safarzadegan Gilan,et al.  Computing with words for hierarchical competency based selection of personnel in construction companies , 2012, Appl. Soft Comput..

[26]  Frank Teuteberg,et al.  Project management standards – Diffusion and application in Germany and Switzerland , 2009 .

[27]  Thomas L. Saaty,et al.  How to Make a Decision: The Analytic Hierarchy Process , 1990 .

[28]  Manochehr Manteghi,et al.  The Automotive Industry , 2013 .

[29]  Kamal M. Al‐Subhi Al‐Harbi,et al.  Application of the AHP in project management , 2001 .

[30]  Hong-Tau Lee,et al.  Performance evaluation model for project managers using managerial practices , 2007 .

[31]  Thomas L. Saaty,et al.  Decision making with the analytic network process , 2013 .

[32]  Jeffrey K. Pinto,et al.  Critical factors in successful project implementation , 1987, IEEE Transactions on Engineering Management.

[33]  Andy Murray,et al.  Managing successful projects with PRINCE2 , 2009 .