ARMS: An automated resource management system for British Telecommunications plc

Abstract Accurate demand forecasting combined with resource planning is critical to a company’s performance and profitability. This paper describes ARMS (automated resource management system), an integrated system developed for the customer service operations of British Telecommunications plc to help with the operational/tactical planning and deployment of the company’s 20,000-strong field engineer workforce. ARMS integrates a forecasting tool with a resource planning tool and a resource balancing tool providing an end-to-end automated resource management solution for the organisation. OR techniques are used throughout the system, including ARIMA for forecasting, constraint satisfaction for problem modelling, heuristic search for problem solving thus demonstrating the value and relevance of OR in solving today’s business problems.

[1]  Manuel Laguna,et al.  Tabu Search , 1997 .

[2]  Fred W. Glover,et al.  Future paths for integer programming and links to artificial intelligence , 1986, Comput. Oper. Res..

[3]  R. Laithwaite Work allocation challenges and solutions in a large-scale work management environment , 1995 .

[4]  David Lesaint,et al.  Dynamic Workforce Scheduling for British Telecommunications plc , 2000, Interfaces.

[5]  Gwilym M. Jenkins,et al.  Time series analysis, forecasting and control , 1972 .

[6]  Gilbert Laporte,et al.  Routing problems: A bibliography , 1995, Ann. Oper. Res..

[7]  Carlos A. Coello Coello,et al.  An updated survey of evolutionary multiobjective optimization techniques: state of the art and future trends , 1999, Proceedings of the 1999 Congress on Evolutionary Computation-CEC99 (Cat. No. 99TH8406).

[8]  C. Reeves Modern heuristic techniques for combinatorial problems , 1993 .

[9]  Edward Tsang Scheduling techniques: a comparative study , 1995 .

[10]  N. Azarmi,et al.  Workforce scheduling with constraint logic programming , 1995 .

[11]  R. S. Laundy,et al.  Multiple Criteria Optimisation: Theory, Computation and Application , 1989 .

[12]  Christos Voudouris,et al.  Integrating Heuristic Search and One-Way Constraints in the Iopt Toolkit , 2003 .

[13]  Claude Le Pape,et al.  Implementation of resource constraints in ILOG SCHEDULE: a library for the development of constraint-based scheduling systems , 1994 .

[14]  P. Young,et al.  Time series analysis, forecasting and control , 1972, IEEE Transactions on Automatic Control.

[15]  Steven C. Wheelwright,et al.  Forecasting methods and applications. , 1979 .

[16]  J. Simpson,et al.  Experience in applying OR techniques to the solution of practical resource management problems , 1995 .

[17]  J. T. Buchanan Mathematical programming and resource management , 1995 .

[18]  Raphaël Dorne,et al.  iOpt: A Software Toolkit for Heuristic Search Methods , 2001, CP.

[19]  J. K. Lenstra,et al.  Local Search in Combinatorial Optimisation. , 1997 .

[20]  N. Azarmi,et al.  Intelligent scheduling and planning systems for telecommunications resource management , 2007 .

[21]  Andrzej Osyczka,et al.  7 – Multicriteria optimization for engineering design , 1985 .

[22]  C. D. Gelatt,et al.  Optimization by Simulated Annealing , 1983, Science.

[23]  B. Hansen Sample Splitting and Threshold Estimation , 2000 .