Consideration of instage and central buffers in two-stage production system

Abstract In this paper, the effect of instage buffer storage and central buffer for bulk storage on the system cost of a two-stage production line is considered for the case where the two production units have different production rates. A mathematical model is developed to determine optimal ready buffer size and number of material handler trips while minimizing total system cost. The model also performs a cost comparison of two potential alternate manufacturing strategies.