Computerized container-ship load planning: a methodology and evaluation
暂无分享,去创建一个
Abstract A heuristic is developed to plan loads for containerized cargo ships. It is designed to serve a port which uses gantry cranes (transtainers) and trucks to handle containers. The model recognizes constraints on ship stability, placing containers in a bay with the proper length, limits on stack height in under-deck bays, limits on stack weight in on-deck bays, refrigerated containers, and the need for support under a container. Provisions are made for the operator to handle overstowage of cargo for different ports and placement of oversize cargo. The model uses minimization of transtainer movement time and minimization of rehandles in the yard as an objective. The heuristic uses strategies for container placement similar to those used in manual load planning. A test of two ships and four voyages at the Port of Portland produced feasible load plans for each voyage. Transtainer movement and rehandling time varied for the four voyages; but on the average, the heuristic reduced a composite material handling measure by 4.8%.
[1] Doug Woon Cho. Development of a methodology for containership load planning , 1981 .
[2] P Van Dyke,et al. THE AUTOMATED PLANNING AND SEQUENCING OF CONTAINERS FOR CONTAINERSHIP LOADING AND UNLOADING , 1976 .
[3] D Scott,et al. OPERATIONAL EVALUATION OF A COMPUTER LOADING PROGRAM FOR CONTAINER VESSELS , 1978 .
[4] Gifford L. Martin,et al. A containership load planning heuristic for a transtainer based container port , 1981 .