Probabilistic Reliability Assessment of Power System Operations

Abstract Although considerable efforts have been devoted to reliability evaluation methods for power system planning in past years, very limited research work has been done for the probabilistic reliability assessment of power system operations. There are fundamental differences between reliability assessments for system planning and operations. After introducing the basic concepts, this article presents 25 subjects, proposes an index system, and discusses special issues for system operation reliability assessment. The major challenges in this area include probabilistic simulations of system dynamics, various operation measures and remedial actions in different timescales, and special requirements in input data and computing speed. The probabilistic reliability assessment of power system operations is an important task for power system researchers and engineers today and in the future.

[1]  Felix F. Wu,et al.  Probabilistic steady-state and dynamic security assessment , 1988 .

[2]  Xiaofu Xiong,et al.  A Statistic-Fuzzy Technique for Clustering Load Curves , 2007, IEEE Transactions on Power Systems.

[3]  P. Choudhury,et al.  Reliability Decision Management System: Experiences at BCTC , 2007, 2007 Canadian Conference on Electrical and Computer Engineering.

[4]  Wenyuan Li,et al.  Reliability Assessment of Electric Power Systems Using Monte Carlo Methods , 1994 .

[5]  João Tomé Saraiva,et al.  Generation/transmission power system reliability evaluation by Monte-Carlo simulation assuming a fuzzy load description , 1995 .

[6]  Vijay Vittal,et al.  A risk-based security index for determining operating limits in stability-limited electric power systems , 1997 .

[7]  Zhou Jia-qi Reliability Assessment of Composite Generation and Transmission Systems Based on Personal Computer Cluster , 2007 .

[8]  Power Systems Engineering Committee Reliability Indices for Use in Bulk Power Supply Adequacy Evaluation , 1978, IEEE Transactions on Power Apparatus and Systems.

[9]  E. Vaahedi,et al.  Large scale probabilistic transient stability assessment using BC Hydro's on-line tool , 2000 .

[10]  J. O. Kim,et al.  Including Uncertainty in LOLE Calculation Using Fuzzy Set Theory , 2002, IEEE Power Engineering Review.

[11]  Wenyuan Li,et al.  Incorporating a Combined Fuzzy and Probabilistic Load Model in Power System Reliability Assessment , 2007, IEEE Transactions on Power Systems.

[12]  J. K. Korczynski,et al.  Application of transmission reliability assessment in probabilistic planning of BC Hydro Vancouver South Metro system , 1995 .

[13]  Ronald N. Allan,et al.  Bibliography on the Application of Probability Methods in Power System Reliability Evaluation 1996-1999 , 1984 .

[14]  D. Lineweber,et al.  The Cost of Power Disturbances to Industrial & Digital Economy Companies , 2001 .

[15]  Wenyuan Li,et al.  Risk Assessment Of Power Systems: Models, Methods, and Applications , 2004 .

[16]  R. Billinton,et al.  A Probabilistic Index for Transient Stability , 1980, IEEE Transactions on Power Apparatus and Systems.

[17]  A. Invernizzi,et al.  Power system security assessment: a position paper , 1997 .

[18]  Roy Billinton,et al.  A hybrid model for quantifying different operating states of composite power systems , 1992 .

[19]  W. Li,et al.  Risk evaluation of transmission system operation modes and its application at British Columbia Transmission Corporation , 2004 .

[20]  Wenyuan Li,et al.  Power System Risk Assessment Using a Hybrid Method of Fuzzy Set and Monte Carlo Simulation , 2008, IEEE Transactions on Power Systems.