On-site Partial Discharges Measurement of XLPE Cables
暂无分享,去创建一个
The contribution deals with the methodol ogy of on-line measurement of partial discharges in XLPE cab les. After the specification of measuring methodology an d used apparatus the evaluation of the measured data follo ws. Contribution gives an example of a real on-site measurement on 110kV XLPE cable power line in operation.