Properties of a sequencing problem for a mixed model assembly line with conveyor stoppages
暂无分享,去创建一个
[1] Katsuhisa Ohno,et al. Algorithms for sequencing mixed models on an assembly line in a JIT production system , 1997 .
[2] L. Tsai. Mixed-model sequencing to minimize utility work and the risk of conveyor stoppage , 1995 .
[3] Avraham Shtub,et al. SEQUENCING MIXED-MODEL ASSEMBLY LINES TO LEVEL PARTS USAGE AND MINIMIZE LINE LENGTH , 1994 .
[4] Liping Cheng,et al. A simple sequencing algorithm for mixed-model assembly lines in just-in-time production systems , 1993, Oper. Res. Lett..
[5] J. Miltenberg,et al. Level schedules for mixed-model assembly lines in just-in-time production systems , 1989 .
[6] Joaquín Bautista,et al. Heuristics and exact algorithms for solving the Monden problem , 1996 .
[7] Candace Arai Yano,et al. Sequencing to minimize work overload in assembly lines with product options , 1991 .
[8] Ezey M. Dar-El,et al. Mixed-model assembly line sequencing problems , 1978 .
[9] Candace Arai Yano,et al. Survey, development, and applications of algorithms for sequencing paced assembly lines , 1989 .
[10] Katsuhisa Ohno,et al. A sequencing problem for a mixed-model assembly line in a JIT production system , 1994 .
[11] Kenjiro Okamura,et al. A heuristic algorithm for the assembly line model-mix sequencing problem to minimize the risk of stopping the conveyor , 1979 .
[12] John B. Kidd,et al. Toyota Production System , 1993 .
[13] W. Kubiak. Minimizing variation of production rates in just-in-time systems: A survey☆ , 1993 .