The workload control concept: theory and practical extensions of Load Oriented Order Release

Workload control (WLC) has been elaborated in the early 1980s to a hierarchical production control concept for job shop manufacturing. In the 1990s the analytical research at the University of Groningen focused on assessing the strengths and weaknesses of this concept and on developing alternatives. Research at the University of Hannover focused on improving the practical applicability of the WLC concept. While the practical experiences confirm the strengths of the WLC concept, some extensions of the basic concept have been developed which may overcome some weaknesses suggested in literature. This paper aims at bringing the theoretical and practical knowledge regarding the WLC concept together. It gives a review and classification of strengths and weaknesses reported from analytical research and it discusses the extensions that have been developed based on practical experiences.

[1]  Alberto Portioli,et al.  An enhanced loading model for the probabilistic workload control under workload imbalance , 1996 .

[2]  G. W. Plossl,et al.  Throughput time control , 1988 .

[3]  Brian G. Kingsman,et al.  Customer Enquiry Management: Part of a Hierarchical System to Control Lead Times in Make-to-Order Companies , 1993 .

[4]  Lawrence M. Wein,et al.  Scheduling Networks of Queues: Heavy Traffic Analysis of a Multistation Network with Controllable Inputs , 2011, Oper. Res..

[5]  Lawrence M. Wein,et al.  Scheduling Networks of Queues: Heavy Traffic Analysis of a Two-Station Network with Controllable Inputs , 1990, Oper. Res..

[6]  Steven A. Melnyk,et al.  Order review/release: research issues and perspectives , 1989 .

[7]  Wolfgang Bechte Theory and practice of load-oriented manufacturing control , 1988 .

[8]  Heinz Häfner Ein Warteschlangenansatz zur integrierten Produktionsplanung , 1992 .

[9]  Lawrence M. Wein,et al.  A broader view of the job-shop scheduling problem , 1992 .

[10]  Wolfgang Bechte Load-oriented manufacturing control just-in-time production for job shops , 1994 .

[11]  I. Tatsiopoulos A microcomputer-based interactive system for managing production and marketing in small component-manufacturing firms using a hierarchical backlog control and lead time management methodology , 1983 .

[12]  G. Gaalman,et al.  The influence of shop characteristics on workload control , 2000 .

[13]  Brian G. Kingsman,et al.  A structural methodology for managing manufacturing lead times in make-to-order companies , 1989 .

[14]  Hans-Peter Wiendahl,et al.  Application of load-oriented manufacturing control in industry , 1992 .

[15]  R. A. Washington,et al.  A broader view. , 1991, Imprint.

[16]  Jwm Will Bertrand,et al.  Production control and information systems for component-manufacturing shops , 1981 .

[17]  Hans-Peter Wiendahl,et al.  Load-Oriented Manufacturing Control , 1994 .

[18]  Martin Land,et al.  Workload control concepts in job shops A critical assessment , 1995 .

[19]  J. J. Kanet Load-limited order release in job shop scheduling systems , 1988 .

[20]  Richard H. Deane,et al.  A Loading and Balancing Methodology for Job Shop Control , 1974 .

[21]  Brian G. Kingsman,et al.  The effect of workload control (WLC) on performance in make-to-order companies , 1998 .

[22]  Roberto Cigolini,et al.  Comparison of Order Review and Release techniques in a dynamic and uncertain job shop environment , 1998 .

[23]  Hubert Missbauer,et al.  Production Planning and Control (PPC) systems including load-oriented order release — Problems and research perspectives , 1993 .

[24]  Brian G. Kingsman,et al.  A Decision Support System for Job Release in Make‐to‐order Companies , 1991 .

[25]  Gerhard Knolmayer,et al.  A Widely Acclaimed Method of Load-Oriented Job Release and its Conceptual Deficiencies , 1991 .

[26]  Roberto Cigolini,et al.  Order review and release strategies ina job shop environment: A review and a classification , 1997 .

[27]  Alberto Portioli,et al.  The impact of parameters setting in load oriented manufacturing control , 1998 .

[28]  Gerard Gaalman,et al.  The performance of workload control concepts in job shops: improving the release method , 1996 .