The workload control concept: theory and practical extensions of Load Oriented Order Release
暂无分享,去创建一个
[1] Alberto Portioli,et al. An enhanced loading model for the probabilistic workload control under workload imbalance , 1996 .
[2] G. W. Plossl,et al. Throughput time control , 1988 .
[3] Brian G. Kingsman,et al. Customer Enquiry Management: Part of a Hierarchical System to Control Lead Times in Make-to-Order Companies , 1993 .
[4] Lawrence M. Wein,et al. Scheduling Networks of Queues: Heavy Traffic Analysis of a Multistation Network with Controllable Inputs , 2011, Oper. Res..
[5] Lawrence M. Wein,et al. Scheduling Networks of Queues: Heavy Traffic Analysis of a Two-Station Network with Controllable Inputs , 1990, Oper. Res..
[6] Steven A. Melnyk,et al. Order review/release: research issues and perspectives , 1989 .
[7] Wolfgang Bechte. Theory and practice of load-oriented manufacturing control , 1988 .
[8] Heinz Häfner. Ein Warteschlangenansatz zur integrierten Produktionsplanung , 1992 .
[9] Lawrence M. Wein,et al. A broader view of the job-shop scheduling problem , 1992 .
[10] Wolfgang Bechte. Load-oriented manufacturing control just-in-time production for job shops , 1994 .
[11] I. Tatsiopoulos. A microcomputer-based interactive system for managing production and marketing in small component-manufacturing firms using a hierarchical backlog control and lead time management methodology , 1983 .
[12] G. Gaalman,et al. The influence of shop characteristics on workload control , 2000 .
[13] Brian G. Kingsman,et al. A structural methodology for managing manufacturing lead times in make-to-order companies , 1989 .
[14] Hans-Peter Wiendahl,et al. Application of load-oriented manufacturing control in industry , 1992 .
[15] R. A. Washington,et al. A broader view. , 1991, Imprint.
[16] Jwm Will Bertrand,et al. Production control and information systems for component-manufacturing shops , 1981 .
[17] Hans-Peter Wiendahl,et al. Load-Oriented Manufacturing Control , 1994 .
[18] Martin Land,et al. Workload control concepts in job shops A critical assessment , 1995 .
[19] J. J. Kanet. Load-limited order release in job shop scheduling systems , 1988 .
[20] Richard H. Deane,et al. A Loading and Balancing Methodology for Job Shop Control , 1974 .
[21] Brian G. Kingsman,et al. The effect of workload control (WLC) on performance in make-to-order companies , 1998 .
[22] Roberto Cigolini,et al. Comparison of Order Review and Release techniques in a dynamic and uncertain job shop environment , 1998 .
[23] Hubert Missbauer,et al. Production Planning and Control (PPC) systems including load-oriented order release — Problems and research perspectives , 1993 .
[24] Brian G. Kingsman,et al. A Decision Support System for Job Release in Make‐to‐order Companies , 1991 .
[25] Gerhard Knolmayer,et al. A Widely Acclaimed Method of Load-Oriented Job Release and its Conceptual Deficiencies , 1991 .
[26] Roberto Cigolini,et al. Order review and release strategies ina job shop environment: A review and a classification , 1997 .
[27] Alberto Portioli,et al. The impact of parameters setting in load oriented manufacturing control , 1998 .
[28] Gerard Gaalman,et al. The performance of workload control concepts in job shops: improving the release method , 1996 .