Evaluating the Marginal Utility of Two-Stage Hydropower Scheduling
暂无分享,去创建一个
Wei Ding | Bing Yu | Yong Peng | Guang-Ming Han | Lin Zhang
[1] Karsten Schulz,et al. Rainfall–runoff modelling using Long Short-Term Memory (LSTM) networks , 2018, Hydrology and Earth System Sciences.
[2] Aida Tayebiyan,et al. Optimization of Exclusive Release Policies for Hydropower Reservoir Operation by Using Genetic Algorithm , 2016, Water Resources Management.
[3] Pan Liu,et al. Evaluating the marginal utility principle for long-term hydropower scheduling , 2015 .
[4] Yong Peng,et al. Optimal operation of cascade hydropower stations using hydrogen as storage medium , 2015 .
[5] Wang Ben-de,et al. Evaluation of optimization operation models for cascaded hydropower reservoirs to utilize medium range forecasting inflow , 2013 .
[6] Hazi Mohammad Azamathulla,et al. Gene-Expression Programming for the Development of a Stage-Discharge Curve of the Pahang River , 2011 .
[7] Pan Liu,et al. Derivation of Aggregation-Based Joint Operating Rule Curves for Cascade Hydropower Reservoirs , 2011 .
[8] Consolación Gil,et al. Optimization methods applied to renewable and sustainable energy: A review , 2011 .
[9] Juan I. Pérez-Díaz,et al. Assessment of the economic impact of environmental constraints on short-term hydropower plant operation , 2010 .
[10] Ximing Cai,et al. Effect of streamflow forecast uncertainty on real-time reservoir operation , 2010 .
[11] Secundino Soares,et al. Minimum loss predispatch model for hydroelectric power systems , 1997 .