Optimization of Input Pulse Considering Both High-Speed Response and Rebound Suppression for Solenoids

In this study, we propose that optimization of the input pulse results in a high-speed response and rebound suppression for solenoids. This input is given by two  impulse voltage responses. The first impulse response rapidly drives the solenoid plunger, and the second suppresses the rebound that occurs upon reaching the  reference position. In the past, these pulse timings have been determined by trial and error. In the present study, the solenoid model was built, and optimal timing of the input pulses was derived by giving an evaluation function  considering both the plunger’s rebound and the arrival time.