Power generation and transmission expansion planning procedures in Asia: market environment and investment problems

The panel will review the present status and prospective ideas of power generation and transmission planning procedures in a market environment. This problem is very important for different countries in Asia, as well as for any other countries which took part in the liberalization of electric power industry. Japan, Korea, China, India, Russia and others are now on the way of transition of their electric power industries to a new market structure and new economical conditions. One of the main aims of electric power industry liberalization is the attraction of investment for new more effective generation and transmission development. The objective estimation of needed investment can be made on the basis of new advanced procedures of generation and transmission expansion planning in a market environment. There are many issues in the discussed problem: the technology of power generation and transmission expansion planning procedures; methods of making decision on generation and transmission network in a market environment; specific features of solving the discussed problem in different countries of the region; use of the correlation state regulation and market mechanisms for attraction of investment; improvement of surplus generation for effective electricity market operation; etc. The Session will stimulate the discussions and studies in this important area.

[1]  E.Yu. Ivanova,et al.  Hierarchical game theoretical problem of electric power system expansion planning , 2003, 2003 IEEE Bologna Power Tech Conference Proceedings,.

[2]  N. I. Voropai,et al.  Multi-criteria decision analysis techniques in electric power system expansion planning , 2002 .

[3]  S. Hunt,et al.  Competition and Choice in Electricity , 1996 .

[4]  Felix Wu,et al.  A Game-Theoretic Model for Generation Expansion Planning: Problem Formulation and Numerical Comparisons , 2001, IEEE Power Engineering Review.

[5]  L. S. Belyaev,et al.  Energy Development and Power Generation Committee Panel Session: "Power Generation and Transmission Expansion Planning Procedures in Asia: Market Environment and Investment Problems" INVESTMENT AND DEVELOPMENT PROBLEMS OF RUSSIA'S POWER INDUSTRY , 2004 .

[6]  F. Wen,et al.  Generation planning and investment under deregulated environment: comparison of USA and China , 2004, IEEE Power Engineering Society General Meeting, 2004..

[7]  V. V. Trufanov,et al.  Methodical principles of making decisions on electric power system expansion in market environment , 2001, 2001 IEEE Porto Power Tech Proceedings (Cat. No.01EX502).

[8]  N. Voropai Investments and development of electric power industry in market environment , 2002, Proceedings. International Conference on Power System Technology.

[9]  J. Contreras,et al.  Coalition formation in transmission expansion planning , 1999, IEEE Power Engineering Society. 1999 Winter Meeting (Cat. No.99CH36233).