Research in Visualization Techniques for Field Construction

Field construction can be planned, monitored, and controlled at two distinct levels: (1) the activity or schedule level; and (2) the operation or process level. Graphical three-dimensional (3D) visualization can serve as an effective communication method at both levels. Many research efforts in visualizing construction are rooted in scheduling. They typically involve linking activity-based construction schedules and 3D computer-aided design (CAD) models of facilities to describe discretely evolving construction product visualizations (often referred to as four-dimensional CAD). The focus is on communicating what components are built where and when, with the intention of studying the optimal activity sequence, spatial, and temporal interferences. The construction processes or operations actually involved in building the components are usually implied. A second approach in visualizing construction is rooted in discrete-event simulation that, in addition to visualizing evolving construction products, also co...

[1]  Rogier Jongeling,et al.  A method for planning of work-flow by combined use of location-based scheduling and 4D CAD , 2007 .

[2]  Bruce H. Thomas,et al.  Using Augmented Reality to Visualise Architecture Designs in an Outdoor Environment , 1999 .

[3]  Martin Fischer,et al.  DECOMPOSING BUILDING SYSTEM DATA FOR MODEL VALIDATION AND ANALYSIS USING THE KOOPMAN OPERATOR , 2010 .

[4]  Bonsang Koo,et al.  Feasibility study of 4D CAD in commercial construction , 2002 .

[5]  Jeffrey F. Skolnick A CAD-Based Construction Simulation Tool Kit for Construction Planning , 1993 .

[6]  Prasant Vajjalu Rekapalli Discrete-event simulation based virtual reality environments for construction operations , 2008 .

[7]  Anil Sawhney,et al.  Simulation of the structural steel erection process , 1999, WSC '99.

[8]  Jonghoon Kim,et al.  Quantitative analysis of workflow, temporary structure usage, and productivity using 4D models , 2008 .

[9]  Steven K. Feiner,et al.  Augmented Reality in Architectural Construction, Inspection, and Renovation , 1996 .

[10]  Vineet R. Kamat,et al.  Robust mobile computing framework for visualization of simulated processes in Augmented Reality , 2010, Proceedings of the 2010 Winter Simulation Conference.

[11]  Feniosky Peña-Mora,et al.  Application of Visualization Techniques for Construction Progress Monitoring , 2007 .

[12]  Vineet R. Kamat VITASCOPE: Extensible and Scalable 3D Visualization of Simulated Construction Operations , 2003 .

[13]  Julio C. Martinez,et al.  Runtime User Interaction in Concurrent Simulation-Animations of Construction Operations , 2009 .

[14]  Silvio Savarese,et al.  Application of D4AR - A 4-Dimensional augmented reality model for automating construction progress monitoring data collection, processing and communication , 2009, J. Inf. Technol. Constr..

[15]  Augusto Op den Bosch Design/construction processes simulation in real-time object-oriented environments , 1994 .

[16]  Ronald Azuma,et al.  Recent Advances in Augmented Reality , 2001, IEEE Computer Graphics and Applications.

[17]  Vineet R. Kamat,et al.  Evaluation of Augmented Reality for Rapid Assessment of Earthquake-Induced Building Damage , 2007 .

[18]  Shashi Shekhar,et al.  Spatial databases - a tour , 2003 .

[19]  Vineet R. Kamat,et al.  Geospatial Databases and Augmented Reality Visualization for Improving Safety in Urban Excavation Operations , 2010 .

[20]  David R. Riley 4-D Space Planning Specification Development for Construction Work Spaces , 1998 .

[21]  Rapıp Akbas Geometry-based modeling and simulation of construction processes , 2003 .

[22]  Vineet R. Kamat,et al.  General-purpose modular hardware and software framework for mobile outdoor augmented reality applications in engineering , 2008, Adv. Eng. Informatics.

[23]  Vineet R. Kamat,et al.  Enabling smooth and scalable dynamic 3D visualization of discrete-event construction simulations , 2001, Proceeding of the 2001 Winter Simulation Conference (Cat. No.01CH37304).

[24]  Julio C. Martinez,et al.  Stroboscope: State and resource based simulation of construction processes. , 1996 .

[25]  Vineet R. Kamat,et al.  Comparison of simulation-driven construction operations visualization and 4D CAD , 2002, Proceedings of the Winter Simulation Conference.

[26]  Feniosky Peña-Mora,et al.  Visual representation of construction progress monitoring metrics on time-lapse photographs , 2007 .

[27]  A. B. Cleveland,et al.  Real-time Animation of Construction Activities , 1989 .

[28]  Burcu Akinci,et al.  An Automated Approach for Accounting for Spaces Required by Construction Activities , 2000 .

[29]  Dace A. Campbell Architectural construction documents on the web: VRML as a case study , 2000 .

[30]  Mani Golparvar-Fard,et al.  Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs , 2009 .

[31]  Arkady Retik,et al.  A library-based 4D visualisation of construction processes , 1997, Proceedings. 1997 IEEE Conference on Information Visualization (Cat. No.97TB100165).

[32]  Dennis Fukai Beyond Sphereland: 4D-CAD in Construction Communications , 2000 .

[33]  Vineet R. Kamat,et al.  Automated Generation of Operations Level Construction Animations in Outdoor Augmented Reality , 2009 .