Line protection: Redundancy, reliability, and affordability
暂无分享,去创建一个
E. O. Schweitzer | D. A. Tziouvaras | D. Whitehead | H. J. A. Ferrer | D. A. Costello | D. S. Escobedo
[1] Levi Portillo,et al. Using innovative electrical and electronic devices in the reduction of panel size , 2010, 2010 63rd Annual Conference for Protective Relay Engineers.
[2] K. Zimmerman. Commissioning of Protective Relay Systems , 2008, 2008 61st Annual Conference for Protective Relay Engineers.
[3] Mark Adamiak,et al. Reliabilty of protection systems (what are the real concerns) , 2010, 2010 63rd Annual Conference for Protective Relay Engineers.
[4] A. Jezak,et al. Aggressive electromechanical relay panel replacement project at TXU electric delivery , 2005, 58th Annual Conference for Protective Relay Engineers, 2005..
[5] Paul M. Anderson. Power System Protection , 1998 .
[6] Ramón Sandoval,et al. Evaluation of Methods for Breaker-Flashover Protection , 2004 .
[7] John Zipp,et al. Redundancy considerations for protective relaying systems , 2010, 2010 63rd Annual Conference for Protective Relay Engineers.
[8] P. Anderson,et al. RELIABILITY ANALYSIS OF TRANSMISSION PROTECTION USING FAULT TREE METHODS , 1997 .
[9] David Costello,et al. Lessons learned from commissioning protective relaying systems , 2009, 2009 62nd Annual Conference for Protective Relay Engineers.
[10] Scott A. Shappell,et al. A Human Error Analysis of Commercial Aviation Accidents Using the Human Factors Analysis and Classification System (HFACS) , 2001 .