Preferred risk allocation in Chinas publicprivate partnership (PPP) projects

Abstract As part of a comprehensive research into PPP implementation, a two-round Delphi survey was conducted with experienced practitioners to identify the preference of risk allocation in China’s PPP projects. The results show that the public sector would take sole responsibility for the risk “Expropriation and nationalization”, and take the majority of responsibility for 12 other risks related to government or government officials and their actions. Fourteen risks which neither the public nor private sector may be able to deal with them alone are preferred to be shared equally. The private sector would take the majority of responsibility for 10 risks that are at the project level. Interestingly, no risk fell into the category that should be solely allocated to the private sector. Further analysis of the reasons behind these allocation preferences was then conducted. Recommendations on commercial principles and contract terms between the public authorities and private consortia are also made.

[1]  Development of Public Private Partnerships ( PPPs ) in China , 2006 .

[2]  Bernice W. Polemis Nonparametric Statistics for the Behavioral Sciences , 1959 .

[3]  Robert L. K. Tiong,et al.  Effects of Tariff Design in Risk Management of Privately Financed Infrastructure Projects , 2003 .

[4]  A. Akintoye,et al.  The allocation of risk in PPP/PFI construction projects in the UK , 2005 .

[5]  S. Ogunlana,et al.  Good project governance for proper risk allocation in public–private partnerships in Indonesia , 2006 .

[6]  Xiaohua Jin,et al.  Interpreting risk allocation mechanism in public–private partnership projects: an empirical study in a transaction cost economics perspective , 2008 .

[7]  Riaz Ahmad,et al.  Risk management trends in the Hong Kong construction industry: a comparison of contractors and owners perceptions , 1999 .

[8]  M. Loosemore,et al.  Risk allocation in the private provision of public infrastructure , 2007 .

[9]  Makarand Hastak,et al.  ICRAM-1: Model for International Construction Risk Assessment , 2000 .

[10]  R. Tiong,et al.  Analysis of political risks and opportunities in public private partnerships (PPP) in China and selected Asian countries , 2007 .

[11]  Patrick T.I. Lam,et al.  Application of Delphi method in selection of procurement systems for construction projects , 2001 .

[12]  R. Tiong,et al.  Political Risks: analysis of Key Contract Clauses in China’s BOT Project , 1999 .

[13]  Raphael Henry Arndt,et al.  Risk Allocation in the Melbourne City Link Project , 1998 .

[14]  Stephen Grey,et al.  Project Risk Management Guidelines: Managing Risk in Large Projects and Complex Procurements , 2004 .

[15]  ShouQing Wang,et al.  Case study of government initiatives for PRC's BOT power plant project , 2000 .

[16]  Hemanta Doloi,et al.  BOT application in China: Driving and impeding factors , 2008 .

[17]  Dan Wang,et al.  Modelling risk allocation decision in construction contracts , 2007 .

[18]  F. Medda A game theory approach for the allocation of risks in transport public private partnerships , 2007 .

[19]  A. Roumboutsos,et al.  Public–private partnership projects in Greece: risk ranking and preferred risk allocation , 2008 .

[20]  ShouQing Wang,et al.  Evaluation and Management of Political Risks in China's BOT Projects , 2000 .

[21]  Steve Rowlinson,et al.  Critical success factors of the BOOT procurement system: reflections from the Stadium Australia case study , 2002 .