A General Framework for Scheduling in a Stochastic Environment
暂无分享,去创建一个
[1] J. Christopher Beck,et al. Proactive Algorithms for Scheduling with Probabilistic Durations , 2005, IJCAI.
[2] Willy Herroelen,et al. Robust and reactive project scheduling: a review and classification of procedures , 2004 .
[3] Nicola Muscettola,et al. Dynamic Control Of Plans With Temporal Uncertainty , 2001, IJCAI.
[4] Thierry Vidal,et al. CTP: A New Constraint-Based Formalism for Conditional, Temporal Planning , 2003, Constraints.
[5] Rachid Alami,et al. Incremental mission allocation to a large team of robots , 1996, Proceedings of IEEE International Conference on Robotics and Automation.
[6] J. Christopher Beck,et al. Using simuation for execution monitoring and on-line rescheduling with uncertain durations , 2003 .
[7] Thomas Schiex,et al. Mixed Constraint Satisfaction: A Framework for Decision Problems under Incomplete Knowledge , 1996, AAAI/IAAI, Vol. 1.
[8] J. Christopher Beck,et al. USING CONSTRAINT PROGRAMMING AND SIMULATION FOR EXECUTION MONITORING AND PROGRESSIVE SCHEDULING , 2006 .