Cost decision making in building maintenance practice in Malaysia
暂无分享,去创建一个
[1] Azlan S.A. Ismail R. Noorhashimah N.. Integrative Mechanisms in the Design Process ofRefurbishment Projects , 2006 .
[2] Ahmad Bin Ramly. Prinsip Dan Praktis Pengurusan Penyenggaraan Bangunan , 2002 .
[3] Martin Fischer,et al. Capitalizing on early project decision-making opportunities to improve facility design, construction, and life-cycle performance-POP, PM4D, and decision dashboard approaches , 2004 .
[4] Ammon Salter,et al. Innovation and performance in engineering design , 2003 .
[5] Ismail Rahmat,et al. Involvement of key design participants in refurbishment design process , 2008 .
[6] Martyn Hammersley,et al. Ethnography : Principles in Practice , 1983 .
[7] Chung Yim Yiu. Intelligent building maintenance — A novel discipline , 2008 .
[8] Charles Odita Egbu. Management education and training for refurbishment work within the construction industry , 1994 .
[9] Ismail Bin Rahmat. The planning and control process of refurbishment projects , 1997 .
[10] Azlan S.A. Ismail R. Noorhashimah N.,et al. The Design Process of Building Refurbishment Projects , 2005 .
[11] Emanuel A. M. Mjema,et al. An analysis of personnel capacity requirement in the maintenance department by using a simulation method , 2002 .
[12] W. G. Marchal,et al. Basic Statistics for Business and Economics , 1994 .
[13] A. C. Sidwell,et al. Project management: Dynamics and performance , 1990 .
[14] Olanrewaju Abdul Lateef,et al. Building maintenance management in Malaysia , 2009 .
[15] David Scott,et al. Overview of maintenance strategy, acceptable maintenance standard and resources from a building maintenance operation perspective , 2009 .
[16] Lee Kiang Quah. An evaluation of the risks in estimating and tendering for refurbishment work. Vol. 1-2 , 1988 .
[17] Terence J. Pitt,et al. Data requirements for the prioritization of predictive building maintenance , 1997 .