Dewatering Design for Deep Foundation Pit of Commercial Building

In the paper,it is introduced the process of selecting parameters and designing plans for dewatering under the hydrogeological conditions of lower upstream backwater level and big coefficient of permeability for stratum,as well as the pumping test is carried out.The results show that the dewatering design of the project is reasonable and the selection of parameters is right,which could provide significant references to similar projects.