Coordination Devices in the Refurbishment Design Process: A Partial-Correlation Approach

Building refurbishment is an important sector in the Malaysian construction industry. The increase the number of building renovations, alterations, extensions and extensive repair works contributed to the high demand for refurbishment projects. However, refurbishment projects are more difficult to manage compared to new-built, due to uncertainty factors inherent in the projects. Therefore, this paper identifies factors that contributed to uncertainty and shows how it affects design performance of refurbishment projects. This paper was also extended to the used of coordination devices to improve design performance from the effect of uncertainty in the projects. Partial-correlation technique was used in data analysis to check any significant moderate effects of coordination devices to control the negative effect of uncertainty on design performance of refurbishment projects. Four (4) coordination devices involved in the partial-correlation tests. The results concluded that the use of lateral relations and architect’s characteristics are most likely reducing the uncertainty of client attributes towards design completeness before work started on site.

[1]  Charles O. Egbu,et al.  Refurbishment management practices in the shipping and construction industries — lessons to be learned: Comparative study of refurbishment management practices conducted to extend the boundaries of knowledge and encourage transfer of information between the sectors , 1996 .

[2]  Julie F. Pallant,et al.  SPSS Survival Manual , 2020 .

[3]  W. A. Wallace Capital costs versus costs-in-use: a content analysis of design team member communication patterns , 1987 .

[4]  Adam Baldwin,et al.  Modelling information flow during the conceptual and schematic stages of building design , 1999 .

[5]  Clyde B. Tatum,et al.  Noncontractual Methods of Integration on Construction Projects , 1992 .

[6]  Raymond E. Levitt,et al.  Computer Integration: Reducing Fragmentation in AEC Industry , 1989 .

[7]  Nabil Kartam,et al.  Design/construction integration: issues and illustrative prototype , 1999 .

[8]  Osama E. K. Daoud The Architect/Engineer’s Role in Rehabilitation Work , 1997 .

[9]  Charles Odita Egbu Management education and training for refurbishment work within the construction industry , 1994 .

[10]  Lee Kiang Quah An evaluation of the risks in estimating and tendering for refurbishment work. Vol. 1-2 , 1988 .

[11]  Michael L. Tushman,et al.  Information Processing as an Integrating Concept in Organizational Design. , 1978 .

[12]  John F. McGeorge DESIGN PRODUCTIVITY: A QUALITY PROBLEM , 1988 .

[13]  P. Lawrence,et al.  Organization and environment , 1967 .

[14]  Yean Yng Ling,et al.  A conceptual model for selection of architects by project managers in Singapore , 2003 .

[15]  G. Di Leo Altering, Extending and Converting Houses: An owner's guide to procedure , 1998 .

[16]  Stephen O. Ogunlana,et al.  Desman: A dynamic model for managing civil engineering design projects , 1998 .

[17]  Jay R. Galbraith Organization Design , 1977 .

[18]  W. J. Stevenson,et al.  PRODUCTION OPERATIONS MANAGEMENT , 1992 .

[19]  Mao-Lin Chiu,et al.  An organizational view of design communication in design collaboration , 2002 .