A fuzzy optimal model for construction resource leveling scheduling

Resource leveling is needed in the construction industry to ensure efficient use of resources. Traditional resource leveling models assume activity durations to be deterministic. Nevertheless, activity duration may be uncertain because of variations in the outside environment, such as weather, site congestion, and productivity level. A new optimal construction resource leveling model is proposed in this paper, in which the combinative effects of both uncertain activity duration and resource leveling are taken into consideration. Fuzzy theory is used to model the uncertainties of activity duration. A searching technique using genetic algorithms is adopted to search for the optimal resource leveling indices under different decision makers' risk levels (i.e., α-cut levels). The model can effectively provide the fuzzy optimal usage profiles of multiple construction resources subjected to the objective of resource leveling.Key words: resource leveling, genetic algorithms, fuzzy set, construction scheduling.

[1]  Osama Moselhi,et al.  Project-network analysis using fuzzy sets theory , 1996 .

[2]  David E. Goldberg,et al.  Genetic Algorithms in Search Optimization and Machine Learning , 1988 .

[3]  J. D. Wiest,et al.  Management Guide to PERT/CPM , 1969 .

[4]  Achintya Haldar,et al.  Project Scheduling Using Fuzzy Set Concepts , 1984 .

[5]  S. Chanas,et al.  THE USE OF FUZZY VARIABLES IN PERT , 1981 .

[6]  Mitsuo Gen,et al.  Genetic algorithms and engineering design , 1997 .

[7]  Robert B. Harris Packing Method for Resource Leveling (PACK) , 1990 .

[8]  George J. Klir,et al.  Fuzzy sets and fuzzy logic - theory and applications , 1995 .

[9]  H. N. Ahuja Construction performance control by networks , 1976 .

[10]  Fabian C. Hadipriono,et al.  Nondeterministic Networking Methods , 1993 .

[11]  Hira N. Ahuja,et al.  Risk evaluation in resource allocation , 1984 .

[12]  Said M. Easa,et al.  Resource Leveling in Construction by Optimization , 1989 .

[13]  C. McCahon Using PERT as an approximation of fuzzy project-network analysis , 1993 .

[14]  Weng Tat Chan,et al.  CONSTRUCTION RESOURCE SCHEDULING WITH GENETIC ALGORITHMS , 1996 .

[15]  Tariq Haroon Ahmad,et al.  Project management with CPM , 1976 .

[16]  Lotfi A. Zadeh,et al.  Fuzzy Sets , 1996, Inf. Control..

[17]  Fabian C. Hadipriono,et al.  Fuzzy Modus Ponens Deduction Technique for Construction Scheduling , 1994 .

[18]  James M. Antill,et al.  Critical path methods in construction practice , 1970 .

[19]  Robert Blynn Harris,et al.  Precedence and Arrow Networking Techniques for Construction , 1980 .

[20]  F. C. Hadipriono,et al.  Angular fuzzy set models for linguistic values , 1990 .

[21]  Roman Slowinski,et al.  Fuzzy priority heuristics for project scheduling , 1996, Fuzzy Sets Syst..

[22]  Chung-Wei Feng,et al.  Using genetic algorithms to solve construction time-cost trade-off problems , 1997 .

[23]  Kuo‐Shong Wang,et al.  Decision making of project under fuzzy information , 1993 .