Construction cost estimation of spherical storage tanks: artificial neural networks and hybrid regression—GA algorithms

One of the most important processes in the early stages of construction projects is to estimate the cost involved. This process involves a wide range of uncertainties, which make it a challenging task. Because of unknown issues, using the experience of the experts or looking for similar cases are the conventional methods to deal with cost estimation. The current study presents data-driven methods for cost estimation based on the application of artificial neural network (ANN) and regression models. The learning algorithms of the ANN are the Levenberg–Marquardt and the Bayesian regulated. Moreover, regression models are hybridized with a genetic algorithm to obtain better estimates of the coefficients. The methods are applied in a real case, where the input parameters of the models are assigned based on the key issues involved in a spherical tank construction. The results reveal that while a high correlation between the estimated cost and the real cost exists; both ANNs could perform better than the hybridized regression models. In addition, the ANN with the Levenberg–Marquardt learning algorithm (LMNN) obtains a better estimation than the ANN with the Bayesian-regulated learning algorithm (BRNN). The correlation between real data and estimated values is over 90%, while the mean square error is achieved around 0.4. The proposed LMNN model can be effective to reduce uncertainty and complexity in the early stages of the construction project.

[1]  Borja García de Soto,et al.  Investigation of the Case-based Reasoning Retrieval Process to Estimate Resources in Construction Projects☆ , 2015 .

[2]  Mohammad Valipour Ability of Box-Jenkins Models to Estimate of Reference Potential Evapotranspiration (A Case Study: Mehrabad Synoptic Station, Tehran, Iran) , 2012 .

[3]  James A. Rodger,et al.  A fuzzy nearest neighbor neural network statistical model for predicting demand for natural gas and energy cost savings in public buildings , 2014, Expert Syst. Appl..

[4]  Krzysztof Zima,et al.  The Case-based Reasoning Model of Cost Estimation at the Preliminary Stage of a Construction Project☆ , 2015 .

[5]  Hilde van der Togt,et al.  Publisher's Note , 2003, J. Netw. Comput. Appl..

[6]  Dirk Cattrysse,et al.  Cost estimation for sheet metal parts using multiple regression and artificial neural networks: A case study , 2008 .

[7]  Seyed Taghi Akhavan Niaki,et al.  A genetic algorithm approach to find the best regression/econometric model among the candidates , 2006, Appl. Math. Comput..

[8]  Sergio Cavalieri,et al.  Parametric vs. neural network models for the estimation of production costs: A case study in the automotive industry , 2004 .

[9]  A. Ghanbarzadeh,et al.  Application of PSO (particle swarm optimization) and GA (genetic algorithm) techniques on demand est , 2010 .

[10]  Jun Wang,et al.  A recurrent neural network for solving Sylvester equation with time-varying coefficients , 2002, IEEE Trans. Neural Networks.

[11]  Avraham Shtub,et al.  Estimating the cost of steel pipe bending, a comparison between neural networks and regression analysis , 1999 .

[12]  Yetis Sazi Murat,et al.  Use of artificial neural networks for transport energy demand modeling , 2006 .

[13]  Mohammad Valipour,et al.  Application of new mass transfer formulae for computation of evapotranspiration , 2014 .

[14]  Hun Hee Cho,et al.  Neural network model incorporating a genetic algorithm in estimating construction costs , 2004 .

[15]  W. T. Chan,et al.  Feature-based cost estimation for packaging products using neural networks , 1996 .

[16]  Zong Woo Geem,et al.  Transport energy demand modeling of South Korea using artificial neural network , 2011 .

[17]  William E. Roper,et al.  Energy demand estimation of South Korea using artificial neural network , 2009 .

[18]  Sung Hoon An,et al.  Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning , 2004 .

[19]  Mohammad Valipour,et al.  INCREASING IRRIGATION EFFICIENCY BY MANAGEMENT STRATEGIES: CUTBACK AND SURGE IRRIGATION , 2013 .

[20]  Mohammad Valipour,et al.  How Much Meteorological Information Is Necessary to Achieve Reliable Accuracy for Rainfall Estimations , 2016 .

[21]  H. S. Wang,et al.  Cost estimation of plastic injection molding parts through integration of PSO and BP neural network , 2013, Expert Syst. Appl..

[22]  Gudarzi Farahani Yazdan,et al.  Energy Consumption in Iran: Past Trends and Future Directions , 2012 .