A two machine bicriteria scheduling problem

Abstract In this paper we consider the bicriteria problem of scheduling n jobs on two parallel machines to minimize the primary criterion of maximum tardiness ( T max ) and the secondary criterion of number of tardy jobs (NT). Algorithms are developed to optimize each of these criteria. Some properties on which the T max algorithm is based are developed. Computational experience with the algorithms is also reported.