Integration of scheduling with computer aided process planning
暂无分享,去创建一个
[1] Hong-Chao Zhang,et al. Computerized Manufacturing Process Planning Systems , 1994 .
[2] Lan Jiang,et al. Improving the performances of part dispatching based on multiple process plans using graph theory , 1998 .
[3] D. H. Norrie,et al. Bidding-based process planning and scheduling in a multi-agent system , 1997 .
[4] John M. Usher,et al. A two-phased approach to dynamic process planning , 1996 .
[5] H.J.J. Kals,et al. The integration of process planning and shop floor scheduling in small batch part manufacturing , 1995 .
[6] T. W. Liao,et al. Modification of CAPP systems for CAPP/scheduling integration , 1993 .
[7] M. Eugene Merchant,et al. IPPM – A Prototype to Integrate Process Planning and Job Shop Scheduling Functions , 1993 .
[8] Behrokh Khoshnevis,et al. Integration of process planning and scheduling functions , 1991, J. Intell. Manuf..
[9] Tung-Hsu Hou,et al. Integration of a CAPP system and an FMS , 1991 .
[10] Stelios Kafandaris,et al. Expert Process Planning for Manufacturing , 1990 .
[11] Hong-Chao Zhang,et al. Computer Aided Process Planning: the state-of-the-art survey , 1989 .
[12] R. M. Sundaram,et al. Process planning and scheduling—a method of integration for productivity improvement , 1988 .
[13] Timothy J. Greene,et al. Alternative routings in CAPP implementation in a FMS , 1988 .
[14] N. P. Suh,et al. An Integrated Approach to Process Planning and Scheduling , 1985 .
[15] Richard A. Wysk,et al. An Introduction to Automated Process Planning Systems , 1984 .
[16] Gideon Halevi,et al. On Line Scheduling for Flexible Manufacturing Systems , 1984 .
[17] M. Suzuki,et al. Development of On-Line, Real-Time, Scheduling Method for a Computer Aided Manufacturing System , 1983 .
[18] W. Eversheim,et al. Survey of Computer-Aided Process Planning Systems , 1982 .