Partnering: definition, theory and evaluation

The concept of partnering in the construction industry stands for a collaborative way of working. Examples of partnering projects can be found on every continent. As suggested in the title this thesis makes contributions to three areas of partnering research: the definition of partnering, the theory behind partnering and how to evaluate the effects of the concept. The thesis consists of six papers with the following main results. A new definition of the concept is provided with the partnering flower in the first paper. This definition model is a concrete, flexible and structured way to define partnering. It forces people to concretise and pinpoint which components they include in partnering in a specific setting. The second paper uses contract theory to understand how partnering can be justified from an efficiency perspective. Partnering can either be seen as something that neutralises opportunism when there is an incomplete contract or something that reduces transaction costs for renegotiation of complete contracts when new information arises. Paper 3 is an empirical study of attitudes towards partnering in the Swedish construction industry, which complements the preceding studies. Among the results can be mentioned that support for the definition of partnering presented in paper 1 is found and that most respondents do not see partnering just as a new fad - a result that is consistent from 2004 to 2006. With the theory and the definition settled, it remains to evaluate the effects of partnering. This is done in two steps. The first step (in paper 4) is through reviewing earlier evaluations and providing suggestions on how the assessments can be improved. One of these suggestions is applied in paper 5, with a quasi-experimental evaluation of partnering comparing ten partnering projects to ten similar non-partnering projects. With improved data, mainly based on site meeting minutes, and a more well-founded method, no support can be found for the strong positive outcome of partnering reported in earlier evaluations. The final paper makes a contribution to economic contract theory by questioning one of the essential assumptions in this literature, the distinction between observable and verifiable characteristics. This aspect surfaced during the study of partnering contracts and contract theory (A). This thesis is available at http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-4355.

[1]  Jean Tirole,et al.  Incomplete contracts: Where do we stand? , 1999 .

[2]  Frederick D. Lazar,et al.  PARTNERING--NEW BENEFITS FROM PEERING INSIDE THE BLACK BOX , 1997 .

[3]  Martin Dufwenberg,et al.  A theory of sequential reciprocity , 2004, Games Econ. Behav..

[4]  M. Whinston,et al.  Incomplete Contracts and Strategic Ambiguity , 1998 .

[5]  Robert Sugden,et al.  Credible worlds: the status of theoretical models in economics , 2000 .

[6]  Steven Shavell,et al.  On the Writing and the Interpretation of Contracts , 2003 .

[7]  Barry Z. Posner,et al.  The Project Manager , 1998 .

[8]  Philip B. Crosby,et al.  Quality Is Free: The Art of Making Quality Certain , 1979 .

[9]  Johan Nyström,et al.  The naivety of partnering assessments , 2006 .

[10]  Peter E.D. Love,et al.  Establishment of Critical Success Factors for Construction Partnering , 2000 .

[11]  George Ofori,et al.  Chinese culture and successful implementation of partnering in Singapore's construction industry , 2001 .

[12]  Kevin J. Murphy,et al.  Relational Contracts and the Theory of the Firm , 1997 .

[13]  J. Barlow,et al.  Innovation and learning in complex offshore construction projects , 2000 .

[14]  F. Scherer The Theory of Contractual Incentives for Cost Reduction , 1964 .

[15]  H. Lind The story and the model done: An evaluation of mathematical models of rent control , 2007 .

[16]  Ralph J. Stephenson Project partnering for the design and construction industry / Ralph J. Stephenson , 1996 .

[17]  Robert E. Spekman,et al.  Characteristics of partnership success: Partnership attributes, communication behavior, and conflict resolution techniques , 1994 .

[18]  Andrea Prat,et al.  The Wrong Kind of Transparency , 2002 .

[19]  A. Banerjee,et al.  Addressing Absence. , 2006, The journal of economic perspectives : a journal of the American Economic Association.

[20]  Michael Y. Mak,et al.  Problematic issues associated with project partnering — the contractor perspective , 2002 .

[21]  Mike Bresnen,et al.  Deconstructing partnering in project-based organisation: Seven pillars, seven paradoxes and seven deadly sins , 2007 .

[22]  Sai On Cheung,et al.  How relational are construction contracts , 2006 .

[23]  Kenneth J. Reynolds,et al.  The efficiency of incomplete contracts: an empirical analysis of air force engine procurement , 1993 .

[24]  A. Schwartz,et al.  The Law and Economics of Costly Contracting , 2001 .

[25]  Bengt Holmstrom,et al.  The Theory of Contracts , 1986 .

[26]  Mike Bresnen,et al.  Building partnerships: case studies of clientcontractor collaboration in the UK construction industry , 2000 .

[27]  Peter Caputi,et al.  Introduction to Quantitative Research Methods: An Investigative Approach , 2001 .

[28]  M. G. Daigle,et al.  PARTNERING& ITS IMPLEMENTATION ON THE CENTRAL ARTERY/TUNNEL PROJECT , 1998 .

[29]  W. Shadish,et al.  Experimental and Quasi-Experimental Designs for Generalized Causal Inference , 2001 .

[30]  Albert P.C. Chan,et al.  An empirical study of the benefits of construction partnering in Hong Kong , 2003 .

[31]  C. Sanchirico,et al.  Evidentiary Arbitrage: The Fabrication of Evidence and the Verifiability of Contract Performance , 2007 .

[32]  Ramon Casadesus-Masanell,et al.  Trust and Discretion in Agency Contracts , 2001 .

[33]  Mary Ann Murphy No More “What Is Communication?” , 1991 .

[34]  Eric Maskin,et al.  Unforeseen Contingencies and Incomplete Contracts , 1999 .

[35]  Stephanie Houghton,et al.  Bidding for Incomplete Contracts: An Empirical Analysis , 2006 .

[36]  Roger Beach,et al.  An evaluation of partnership development in the construction industry , 2005 .

[37]  P. Gardiner,et al.  Revisiting the golden triangle of cost, time and quality: the role of NPV in project control, success and failure , 2000 .

[38]  Frederick D. Lazar,et al.  Project Partnering: Improving the Likelihood of Win/Win Outcomes , 2000 .

[39]  Pierpaolo Battigalli,et al.  Rigidity, Discretion, and the Costs of Writing Contracts , 2002 .

[40]  Patrick T.I. Lam,et al.  Partnering for construction excellence—A reality or myth? , 2006 .

[41]  Eric Brousseau,et al.  EDI and inter-firm relationships: toward a standardization of coordination processes? , 1994 .

[42]  E. Brousseau,et al.  Incomplete contracts and governance structures: are incomplete contract theory and new institutional economics substitutes or complements? , 2000 .

[43]  R. Scott,et al.  Incomplete Contracts and the Theory of Contract Design , 2005 .

[44]  M. Bresnen,et al.  Motivation, commitment and the use of incentives in partnerships and alliances , 2000 .

[45]  K. Lancaster A New Approach to Consumer Theory , 1966, Journal of Political Economy.

[46]  Stuart D. Green Partnering: the propaganda of corporatism? , 1999 .

[47]  Chau Kwong Wing,et al.  The ranking of construction management journals , 1997 .

[48]  Joan V. Robinson,et al.  The Nature of the Firm , 2004 .

[49]  A. Kadefors Trust in project relationships-inside the black box , 2004 .

[50]  Oliver Hart,et al.  Foundations of Incomplete Contracts , 1998 .

[51]  Andrew R.J. Dainty,et al.  Redefining performance measures for construction project managers: an empirical evaluation , 2003 .

[52]  Bruce D. Meyer Natural and Quasi- Experiments in Economics , 1994 .

[53]  Chris Ivory,et al.  Partnering in major contracts: Paradox and metaphor , 2007 .

[54]  Johan Nyström The definition of partnering as a Wittgenstein family‐resemblance concept , 2005 .

[55]  Sai On Cheung,et al.  Behavioral aspects in construction partnering , 2003 .

[56]  Sai On Cheung,et al.  Effective partnering tools in construction: a case study on MTRC TKE contract 604 in Hong Kong , 2004 .

[57]  J. K. Bennett,et al.  The Seven Pillars of Partnering: A Guide to Second Generation Partnering , 1998 .

[58]  Feniosky Peña-Mora,et al.  EFFECTIVE PARTNERING IN INNOVATIVE PROCURED MULTICULTURAL PROJECT , 1999 .

[59]  C. Achilles,et al.  Evaluation: A Systematic Approach , 1980 .

[60]  Ernst Fehr,et al.  Theories of Fairness and Reciprocity , 2001 .

[61]  Oliver Hart,et al.  Firms, contracts, and financial structure , 1995 .

[62]  Nehemia Friedland,et al.  Attribution of Control as a Determinant of Cooperation in Exchange Interactions , 1990 .

[63]  Colin Camerer,et al.  Not So Different After All: A Cross-Discipline View Of Trust , 1998 .

[64]  Brychan Thomas,et al.  Partnering in the house building sector: a subcontractor's view , 2003 .

[65]  Paul Humphreys,et al.  Pre‐construction project partnering: from adversarial to collaborative relationships , 2003 .

[66]  Margaret Emsley A benefits analysis of partnering: A case study of a community primary school , 2005 .

[67]  E. Fehr,et al.  Do Incentive Contracts Crowd Out Voluntary Cooperation? , 2000 .

[68]  Ilya Segal,et al.  Complexity and Renegotiation: A Foundation for Incomplete Contracts , 1999 .

[69]  Luca Anderlini,et al.  Incomplete Contracts and Complexity Costs , 1998 .

[70]  Akintola Akintoye,et al.  An analysis of success factors and benefits of partnering in construction , 2000 .

[71]  Chris Hendrickson,et al.  Owner-Contractor Relationships on Contaminated Site Remediation Projects , 1996 .

[72]  R. Yin Case Study Research: Design and Methods , 1984 .

[73]  Peter H. Rossi,et al.  Evaluation Research , 1977 .

[74]  Larry G. Crowley,et al.  Conceptual Model of Partnering , 1995 .

[75]  Four Formal(Izable) Theories of the Firm? , 2004 .

[76]  Chris Fortune,et al.  Partnering practice and the delivery of construction projects for Housing Associations in the UK , 2005 .

[77]  Luca Anderlini,et al.  Incomplete Written Contracts: Undescribable States of Nature , 1994 .

[78]  John W. Creswell,et al.  Research Design: Qualitative, Quantitative, and Mixed Methods Approaches , 2010 .

[79]  O. Hart,et al.  Property Rights and the Nature of the Firm , 1988, Journal of Political Economy.

[80]  张谷 实验经济学(Experimental Economics)研究思路及成果应用简述 , 1994 .

[81]  Douglas D. Gransberg,et al.  QUANTITATIVE ANALYSIS OF PARTNERED PROJECT PERFORMANCE , 1999 .

[82]  David W. Miller,et al.  BEYOND ADR: WORKING TOWARD SYNERGISTIC STRATEGIC PARTNERSHIP , 1995 .

[83]  Sanford J. Grossman,et al.  The Costs and Benefits of Ownership: A Theory of Vertical and Lateral Integration , 1986 .

[84]  L. H. Vassie,et al.  Assessing the inputs and outputs of partnership arrangements for health and safety management , 2003 .

[85]  Mark W. Lipsey,et al.  Evaluation: A Systematic Approach , 1979 .

[86]  Jeffrey M. Wooldridge,et al.  Introductory Econometrics: A Modern Approach , 1999 .

[87]  R. Scott,et al.  Anticipating Litigation in Contract Design , 2006 .

[88]  R. Merton,et al.  Non-Contractual Relations in Business : A Preliminary Study , 2007 .

[89]  Richard Levin,et al.  Statistics for Management. , 1979 .

[90]  R. Dye Costly Contract Contingencies , 1985 .

[91]  Paul R. Milgrom,et al.  Multitask Principal–Agent Analyses: Incentive Contracts, Asset Ownership, and Job Design , 1991 .

[92]  N. Denzin The research act: A theoretical introduction to sociological methods , 1977 .

[93]  David Lewis Radical interpretation , 2004, Synthese.

[94]  Johan Nyström Partnering : definition, theory and the procurement phase , 2005 .

[95]  Roger Atkinson,et al.  Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria , 1999 .

[96]  A. B. Ngowi,et al.  The role of trustworthiness in the formation and governance of construction alliances , 2007 .

[97]  Gopal K. Kanji,et al.  Quality culture in the construction industry , 1998 .

[98]  Attila Dikbas,et al.  An assessment of the applicability of partnering in the Turkish construction sector , 2002 .

[99]  Paul E. Himes Partnering in the construction process: the method for the 1990s and beyond , 1995 .

[100]  Donald Davidson,et al.  Subjective, Intersubjective, Objective , 2003 .

[101]  Erik Larson,et al.  Project Partnering: Results of Study of 280 Construction Projects , 1995 .

[102]  Evert Vedung,et al.  Utvärdering i politik och förvaltning , 1991 .

[103]  Shamil Naoum An overview into the concept of partnering , 2003 .