Optimising material procurement for construction waste minimization: An exploration of success factors

[1]  Nasir Shafiq,et al.  A review on adoption of novel techniques in construction waste management and policy , 2017 .

[2]  E. Manafi Existential-Phenomenological Perspectives , 2017 .

[3]  Lukumon O. Oyedele,et al.  Critical management practices influencing on-site waste minimization in construction projects. , 2017, Waste management.

[4]  Rudy Tawie,et al.  Factors Influencing Waste Generation in the Construction Industry in Malaysia , 2016 .

[5]  Lukumon O. Oyedele,et al.  Evaluation criteria for construction waste management tools: towards a holistic BIM framework , 2016 .

[6]  Lukumon O. Oyedele,et al.  Waste minimisation through deconstruction: A BIM based Deconstructability Assessment Score (BIM-DAS) , 2015 .

[7]  Lukumon O. Oyedele,et al.  Waste Effectiveness of the Construction Industry: Understanding the 1 Impediments and Requisites for Improvements. 2 , 2016 .

[8]  Jian Zuo,et al.  Improving waste management in construction projects: An Australian study , 2015 .

[9]  Vivian W. Y Tam,et al.  Identifying best design strategies for construction waste minimization , 2015 .

[10]  Junaid Qadir,et al.  Analysis of critical features and evaluation of BIM software: Towards a plug-in for construction waste minimization using big data , 2015 .

[11]  Lukumon O. Oyedele,et al.  Use of recycled products in UK construction industry: An empirical investigation into critical impediments and strategies for improvement , 2014 .

[12]  Matthew Dolan,et al.  Material waste in the Northern Ireland construction industry: on-site management causes and methods of prevention , 2014 .

[13]  Soo Yong Kim,et al.  Identifying causes for waste factors in high-rise building projects: A survey in Vietnam , 2014 .

[14]  Tele Tan,et al.  Breaking into BIM: Performing static and dynamic security analysis with the aid of BIM , 2014 .

[15]  Wenzhong Zhu,et al.  Influence of mixed recycled aggregate on the physical – mechanical properties of recycled concrete , 2014 .

[16]  Nick Johnstone,et al.  Better the devil you throw: Experience and support for pay-as-you-throw waste charges , 2014 .

[17]  Lukumon O. Oyedele,et al.  Ineffectiveness of construction waste management strategies: Knowledge gap analysis. In: Okeil, M. (2014). Smart, Sustainable and Healthy City , 2014 .

[18]  Vivian W. Y Tam,et al.  Critical factors in effective construction waste minimization at the design stage: A Shenzhen case study, China , 2014 .

[19]  Lukumon O. Oyedele,et al.  Reducing Waste to Landfill in the UK: Identifying Impediments and Critical Solutions , 2013 .

[20]  Tara L. Cavalline,et al.  Recycled brick masonry aggregate concrete , 2013 .

[21]  Hongping Yuan,et al.  Critical Management Measures Contributing to Construction Waste Management: Evidence from Construction Projects in China , 2013 .

[22]  Ameh Oko John,et al.  Professionals’ views of material wastage on construction sites and cost overruns , 2013 .

[23]  Sang-Ho Lee,et al.  Life cycle carbon dioxide assessment tool for buildings in the schematic design phase , 2013 .

[24]  Paola Villoria Sáez,et al.  Best practice measures assessment for construction and demolition waste management in building constructions , 2013 .

[25]  Jack C. P. Cheng,et al.  A BIM-based system for demolition and renovation waste estimation and planning. , 2013, Waste management.

[26]  Taher Abu-Lebdeh,et al.  Utilization of Recycled and Waste Materials in Various Construction Applications , 2013 .

[27]  Mohamed Osmani,et al.  Design waste mapping: a project life cycle approach , 2013 .

[28]  Rehan Sadiq,et al.  An overview of construction and demolition waste management in Canada: a lifecycle analysis approach to sustainability , 2013, Clean Technologies and Environmental Policy.

[29]  Ismail Abdul Rahman,et al.  Identifying Causes of Construction Waste - Case of Central Region of Peninsula Malaysia , 2012 .

[30]  김성문,et al.  [해외 대학 연구센터 소개] Rutgers, The State University of New Jersey , 2012 .

[31]  Hongping Yuan,et al.  A dynamic model for assessing the effects of management strategies on the reduction of construction and demolition waste. , 2012, Waste management.

[32]  Nadira Ahzahar,et al.  Waste Management Issues in the Northern Region of Malaysia , 2012 .

[33]  Assem Al-Hajj,et al.  Material Waste in the UAE Construction Industry: Main Causes and Minimization Practices , 2011 .

[34]  Weisheng Lu,et al.  An empirical investigation of construction and demolition waste generation rates in Shenzhen city, South China. , 2011, Waste management.

[35]  Mercedes del Río Merino,et al.  Sustainable construction: construction and demolition waste reconsidered , 2010, Waste management & research : the journal of the International Solid Wastes and Public Cleansing Association, ISWA.

[36]  Anders Lagerkvist,et al.  Pay as you throw: strengths and weaknesses of weight-based billing in household waste collection systems in Sweden. , 2010, Waste management.

[37]  Andrew N. Baldwin,et al.  Designing out waste in high-rise residential buildings : analysis of precasting methods and traditional construction , 2009 .

[38]  Jaime Solís-Guzmán,et al.  A Spanish model for quantification and management of construction waste. , 2009, Waste management.

[39]  Jeehye Kim,et al.  Identifying and Assessing Influence Factors on Improving Waste Management Performance for Building Construction Projects , 2009 .

[40]  Rawshan Ara Begum,et al.  Attitude and behavioral factors in waste management in the construction industry of Malaysia , 2009 .

[41]  Shabbir H Gheewala,et al.  Estimation of construction waste generation and management in Thailand. , 2009, Waste management.

[42]  Andy Field,et al.  Discovering statistics using SPSS: and sex and drugs and rock 'n' roll, 3rd Edition , 2009 .

[43]  J. Glass,et al.  AN INVESTIGATION INTO THE IMPACT OF PROCUREMENT SYSTEMS ON WASTE GENERATION: THE CONTRACTORS' PERSPECTIVE , 2009 .

[44]  L. Skumatz,et al.  Pay as you throw in the US: implementation, impacts, and experience. , 2008, Waste management.

[45]  Vivian W. Y Tam,et al.  An investigation of construction wastes: an empirical study in Shenzhen , 2008 .

[46]  M Osmani,et al.  Architects' perspectives on construction waste reduction by design. , 2008, Waste management.

[47]  Lau Composition and Characteristics of Construction Waste Generated by Residential Housing Project , 2008 .

[48]  Vivian W Y Tam,et al.  On the effectiveness in implementing a waste-management-plan method in construction. , 2008, Waste management.

[49]  Vivian W. Y Tam,et al.  Towards adoption of prefabrication in construction , 2007 .

[50]  Rawshan Ara Begum,et al.  Implementation of waste management and minimisation in the construction industry of Malaysia , 2007 .

[51]  Nilay Cosgun,et al.  A study conducted to reduce construction waste generation in Turkey , 2007 .

[52]  V. Braun,et al.  Using thematic analysis in psychology , 2006 .

[53]  George Ofori,et al.  Building waste assessment score: design-based tool , 2004 .

[54]  Paul Micklethwaite,et al.  Specifying recycled: understanding UK architects’ and designers’ practices and experience , 2004 .

[55]  Andrew R.J. Dainty,et al.  Towards improved construction waste minimisation: a need for improved supply chain integration? , 2004 .

[56]  Lucio Soibelman,et al.  Material Waste in Building Industry: Main Causes and Prevention , 2002 .

[57]  Ann T. W. Yu,et al.  On-site sorting of construction and demolition waste in Hong Kong , 2001 .

[58]  Peter E.D. Love,et al.  An e‐commerce system for construction material procurement , 2001 .

[59]  G. Garas,et al.  Materials Waste in the Egyptian Construction Industry , 2001 .

[60]  Ni-Bin Chang,et al.  Prediction analysis of solid waste generation based on grey fuzzy dynamic modeling , 2000 .

[61]  O. O. Faniran,et al.  Minimizing waste on construction project sites , 1998 .

[62]  Akintola Akintoye,et al.  Risk analysis and management of Private Finance Initiative projects , 1998 .

[63]  M. Crotty The Foundations of Social Research: Meaning and Perspective in the Research Process , 1998 .

[64]  J. Creswell Qualitative inquiry and research design: choosing among five traditions. , 1998 .

[65]  P. Phillips,et al.  Landfill as a Future Waste Management Option in England: the view of landfill operators , 1997 .

[66]  Hjh Jos Brouwers,et al.  Construction Waste: Quantification and Source Evaluation , 1996 .

[67]  Chiel Boonstra,et al.  Handbook of Sustainable Building: An Environmental Preference Method for Selection of Materials for Use in Construction and Refurbishment , 1996 .

[68]  S. Kvale Interviews : an introduction to qualitative research interviewing , 1996 .

[69]  Leonhard E. Bernold,et al.  Source evaluation of solid waste in building construction , 1994 .

[70]  C. Moustakas Phenomenological Research Methods , 1994 .

[71]  M. Jasper,et al.  Issues in phenomenology for researchers of nursing. , 1994, Journal of advanced nursing.

[72]  Leonhard E. Bernold,et al.  Vendor analysis for best buy in construction , 1991 .

[73]  F. W. Fleming,et al.  Estimating for Builders and Quantity Surveyors , 1991 .

[74]  M. Manen Researching Lived Experience: Human Science for an Action Sensitive Pedagogy , 1990 .

[75]  S. Halling,et al.  Existential-Phenomenological Perspectives in Psychology , 1989 .

[76]  E. R. Skoyles,et al.  Materials wastage – a misuse of resources , 1976 .