CONTROLLER ROLES - TIME TO CHANGE

This paper presents concepts and initial simulation results put forward by C3T (Controller Tools and Transition Trials [1]) a study project, whose aim is to define, develop and evaluate controller roles, tasks and working methods suited to the introduction of ATM Decision Support Tools (DST) and data link communication. The project is in support of the EUROCONTROL ATM2000 + strategy [2] and will apply both model and real-time simulation techniques.