Cost of Risk Transfer: Pricing Agreements in Residential Supply Chains
暂无分享,去创建一个
Anil Sawhney | Howard H. Bashford | A. Sawhney | K. Walsh | Kenneth Walsh | Andreas Witjakso | H. Bashford | Andreas Witjakso
[1] Trefor P. Williams,et al. Predicting Changes in Construction Cost Indexes Using Neural Networks , 1994 .
[2] Thomas Y. Choi,et al. Supply networks and complex adaptive systems: Control versus emergence , 2001 .
[3] Anil Sawhney,et al. Production System Loading-Cycle Time Relationship in Residential Construction , 2005 .
[4] W. Phillips,et al. Transparency in supply relationships: concept and practice , 2001, IEEE Engineering Management Review.
[5] Anil Sawhney,et al. Implications of Even Flow Production Methodology for U.S. Housing Industry , 2003 .
[6] Andrew R.J. Dainty,et al. Subcontractor perspectives on supply chain alliances , 2001 .
[7] Lisa M. Ellram,et al. Supplier-supplier relationships and their implications for buyer-supplier relationships , 2002, IEEE Trans. Engineering Management.
[8] Robert Damelio,et al. The Basics of Process Mapping , 1996 .
[9] Ekambaram Palaneeswaran,et al. Selection matters – in construction supply chain optimisation , 2000 .
[10] J. Jayaram,et al. Supply Chain Management: A Strategic Perspective , 1997 .
[11] Iris D. Tommelein,et al. Lead time reduction via pre-positioning of inventory in an industrial construction supply chain , 2002, Proceedings of the Winter Simulation Conference.
[12] Iris D. Tommelein,et al. Just-in-Time Concrete Delivery: Mapping Alternatives for Vertical Supply Chain Integration , 1999 .