Optimization of preventive condition-based tamping for railway tracks

This work considers the scheduling of railway preventive condition-based tamping, which is the maintenance operation performed to restore the track irregularities to ensure both safety and comfort for passengers and freight. The problem is to determine when to perform the tamping on which section for given railway tracks over a planning horizon. The objective is to minimize the Net Present Costs (NPC) considering the following technical and economic factors: 1) track quality (the standard deviation of the longitudinal level) degradation over time; 2) track quality thresholds based on train speed limits; 3) the impact of previous tamping operations on the track quality recovery; 4) track geometrical alignment; 5) tamping machine operation factors and finally 6) the discount rate.

[1]  James C. Chu,et al.  Optimal threshold-based network-level transportation infrastructure life-cycle management with heterogeneous maintenance actions , 2012 .

[2]  Luis Ferreira,et al.  Modelling rail track deterioration and maintenance: current practices and future needs , 1997 .

[3]  Rommert Dekker,et al.  A DYNAMIC APPROACH FOR PLANNING PREVENTIVE RAILWAY MAINTENANCE ACTIVITIES , 2004 .

[4]  Rui Calçada,et al.  Integer Programming to Optimize Tamping in Railway Tracks as Preventive Maintenance , 2012 .

[5]  A. Zoeteman Life cycle cost analysis for managing rail infrastructure , 2001 .

[6]  Sue McNeil,et al.  TECHNOLOGIES FOR PLANNING RAILROAD TRACK MAINTENANCE AND RENEWAL , 1994 .

[7]  Dan M. Frangopol,et al.  Evaluation of Expected Life-Cycle Maintenance Cost of Deteriorating Structures , 2003 .

[8]  Christopher P. L. Barkan,et al.  Cost-Effectiveness of Railway Infrastructure Renewal Maintenance , 2006 .

[9]  Peter Veit Track Quality - Luxury or Necessity? , 2007 .

[10]  Cecília Vale,et al.  Stochastic model for the geometrical rail track degradation process in the Portuguese railway Northern Line , 2013, Reliab. Eng. Syst. Saf..

[11]  E Schnieder,et al.  Monte Carlo simulation of railway track geometry deterioration and restoration , 2012 .

[12]  H. Chang,et al.  A multi-stage linear prediction model for the irregularity of the longitudinal level over unit railway sections , 2010 .

[13]  Erhan Kozan,et al.  Optimal scheduling of trains on a single line track , 1996 .

[14]  Michael Macke,et al.  Optimizing Maintenance Interventions for Deteriorating Structures Using Cost-Benefit Criteria , 2007 .

[15]  H. M. Wagner,et al.  Preventive Maintenance Scheduling by Mathematical Programming , 1964 .

[16]  Paulo Fonseca Teixeira,et al.  Optimisation model to schedule railway track renewal operations: a life-cycle cost approach , 2015 .

[17]  Isabel M. Ribeiro,et al.  Railway condition-based maintenance model with stochastic deterioration , 2014 .

[18]  Masashi Miwa,et al.  Mathematical modeling analyses for obtaining an optimal railway track maintenance schedule , 2006 .

[19]  Nicola Bosso,et al.  Automated and Cost Effective Maintenance for Railway (ACEM–Rail) , 2012 .

[20]  Arjen Zoeteman,et al.  Asset maintenance management: state of the art in the European railways , 2006, Int. J. Crit. Infrastructures.