Investigation on extended black-start schemes of power system considering reasonable load restoration
暂无分享,去创建一个
[1] Kevin M. Passino,et al. Biomimicry of bacterial foraging for distributed optimization and control , 2002 .
[2] Xueping Gu,et al. Optimisation of network reconfiguration based on a two-layer unit-restarting framework for power system restoration , 2012 .
[3] Wang Yong. Extended Black-start Schemes of Power Systems , 2011 .
[4] J. J. Ancona. A framework for power system restoration following a major power failure , 1995 .
[5] Zhao Xu,et al. Electric Vehicles in Danish Power System with Large Penetration of Wind Power , 2011 .
[6] Chen-Ching Liu,et al. From generic restoration actions to specific restoration strategies , 1995 .
[7] Hanbing Qu,et al. Load restoration optimization during last stage of network reconfiguration , 2014, 2014 China International Conference on Electricity Distribution (CICED).
[8] Liu Yutian. Load Restoration Optimization During Unit Start-up Stage , 2011 .