Waltzing with Bears: Managing Risk on Software Projects
暂无分享,去创建一个
Part I: Why bother to do risk management? • Risk is always there, so manage it instead of ignoring it. • Risk is a possible future event that will lead to an undesirable outcome (problem). There are 5 steps to manage risk: discovery, analysis, planning, mitigation, monitoring. • Unmanaged risks that materialize into problems are very costly, both to the company and to individuals. • Good process alone isn't sufficient to mitigate risks. • Risk management provides many benefits.
[1] Gerald M. Weinberg. Rethinking Systems Analysis & Design , 1982 .
[2] Meilir Page-Jones,et al. What Every Programmer Should Know About Object-Oriented Design , 1996 .