JIT scheduling rules: a simulation evaluation
暂无分享,去创建一个
[1] L. C. LEEj. Parametric appraisal of the JIT system , 1987 .
[2] Blair J. Berkley,et al. A Simulation Study of Sequencing Rules in a Kanban‐Controlled Flow Shop* , 1991 .
[3] Blair J. Berkley. Effect of buffer capacity and sequencing rules on single-card kanban system performance , 1993 .
[4] Amrik S. Sohal,et al. A Review of Literature Relating to JIT , 1989 .
[5] Sang M. Lee,et al. Implementation of Just‐in‐time Systems in US Manufacturing Firms , 1989 .
[6] Blair J. Berkley. Simulation Tests of FCFS and SPT Sequencing in Kanban Systems , 1993 .
[7] X. Chao,et al. Prioritization of kanbans in the case of a single station serving multiple downstream stations , 1995 .
[8] Y. Sugimori,et al. Toyota production system and Kanban system Materialization of just-in-time and respect-for-human system , 1977 .
[9] T. Cheng,et al. The just-in-time production: A survey of its development and perception in the Hong Kong electronics industry , 1988 .
[10] Ahmet Satir,et al. A kanban-based simulation study of a mixed model just-in-time manufacturing line , 1995 .
[11] John Miltenburg,et al. Scheduling mixed-model multi-level just-in-time production systems , 1989 .
[12] Sin-Hoon Hum,et al. A study on just‐in‐time practices in Singapore , 1995 .
[13] P. R. PHlLlPOO,et al. Simultaneously determining the number of kanbans, container sizes, and the final-assembly sequence of products in a just-in-time shop. , 1996 .
[14] K.H.W. Seah,et al. JIT and the Effects of Varying Process and Set‐Up Times , 1988 .
[15] Rhonda R. Lummus. A simulation analysis of sequencing alternatives for JIT lines using kanbans , 1995 .
[16] Loren Paul Rees,et al. A SIMULATION ANALYSIS OF THE JAPANESE JUST‐IN‐TIME TECHNIQUE (WITH KANBANS) FOR A MULTILINE, MULTISTAGE PRODUCTION SYSTEM , 1983 .
[17] Tae-Moon Kim. Just-in-time manufacturing system: a periodic pull system , 1985 .
[18] S. Jordan. Analysis and Approximation of a JIT Production Line , 1988 .
[19] Christopher A. Voss,et al. Application of Just‐in‐Time Manufacturing Techniques in the United Kingdom , 1987 .
[20] Loren Paul Rees,et al. A mathematical programming approach for determining workcentre lotsizes in a just-in-time system with signal Kanbans , 1990 .
[21] Y. Monden. Toyota Production System: Practical Approach to Production Management , 1983 .
[22] H Isakari,et al. JUST IN TIME MANUFACTURING , 1988 .
[23] James F. Cox,et al. A study of JIT implementation and operating problems , 1988 .
[24] Damodar Y. Golhar,et al. The just-in-time philosophy : a literature review , 1991 .