Link and effect model for performance improvement of railway infrastructure

Railway traffic has increased over the last decade due to its fuel efficiency and the need to reduce emissions. The railway infrastructure performance needs to be measured to allow assets to be managed effectively against set objectives. Various systems are used to collect and store data on traffic, failures, inspections, track quality, etc. However, these systems are often used in an ad hoc manner, partly because of the weaknesses of traditional performance measurement systems. This paper proposes a link and effect model which is focused on the areas of continuous improvement, the key elements of strategic planning and on the underlying factors responsible for the railway performance. The model provides information on the performance of railway systems and components, and how they are linked to each other and to the overall objectives, thereby facilitating proactive decision-making. The model is applied in a case study on the Iron Ore Line in Sweden. The performance of a section of the line is studied in terms of failures, train delays and repair times, and ranked through a risk matrix and composite indicator.

[1]  Aditya Parida,et al.  Development of a multi-criteria hierarchical framework for maintenance performance measurement: concepts, issues and challenges , 2006 .

[2]  Albert H. C. Tsang Strategic dimensions of maintenance management , 2002 .

[3]  Uday Kumar,et al.  Maintenance performance measurement (MPM): issues and challenges , 2006 .

[4]  Arne Nissen Classification and cost analysis of switches and crossings for the Swedish railway: a case study , 2009 .

[5]  Uday Kumar,et al.  Product support strategy: conventional versus functional products , 2005 .

[6]  H. Johnson,et al.  The search for gain in markets and firms: A review of the historical emergence of management accounting systems , 1983 .

[7]  Stefano Tarantola,et al.  Handbook on Constructing Composite Indicators: Methodology and User Guide , 2005 .

[8]  Robert D. Pritchard,et al.  Implementing feedback systems to enhance productivity: A practical guide , 1990 .

[9]  Joel K. Leidecker,et al.  Identifying and using critical success factors , 1984 .

[10]  Aditya Parida,et al.  Maintenance performance indicators for railway infrastructure management , 2012 .

[11]  Andy Neely,et al.  The success and failure of performance measurement initiatives: Perceptions of participating managers , 2002 .

[12]  Aditya Parida,et al.  Maintenance Productivity and Performance Measurement , 2009 .

[13]  J. P. Kennedy,et al.  MEASURING, MANAGING AND MAXIMIZING PERFORMANCE IN PETROLEUM REFINERIES , 1996 .

[14]  西山 茂 戦略管理会計 = Managerial accounting , 2009 .

[15]  Uday Kumar,et al.  Assessment and improvement of railway track safety , 2009 .

[16]  Mohamed Zairi,et al.  Effective process management through performance measurement , 1995 .

[17]  R. Kaplan,et al.  PUTTING THE BALANCED SCORECARD TO WORK , 1993 .

[18]  Birre Nyström,et al.  Analysis of train delay information , 2003 .

[19]  Peter Söderholm,et al.  Punctuality measurements effect on the maintenance process : a study of train delay statistics for the Swedish railway , 2005 .

[20]  Franklin Farell Roadmap to a Single European Transport Area: Towards a competitive and resource efficient transport system , 2014 .

[21]  Eric Berggren Efficient Track Maintenance: Methodology for Combined Analysis of Condition Data , 2009 .

[22]  Ulla Espling,et al.  Part I. A framework of partnering for infrastructure maintenance , 2004 .

[23]  Ramin Karim,et al.  E‐maintenance and information logistics: aspects of content format , 2009 .

[24]  Uday Kumar,et al.  Maintenance value drivers, killers and their indicators , 2011 .

[25]  Christer Stenström,et al.  Maintenance performance measurement of railway infrastructure with focus on the Swedish network , 2012 .

[26]  J. Armstrong,et al.  The value of formal planning for strategic decisions: Review of empirical research , 1982 .

[27]  Albert H. C. Tsang,et al.  A strategic approach to managing maintenance performance , 1998 .

[28]  Buang Alias,et al.  Performance measurement in the service business: the facilities management function , 2005 .

[29]  R. Kaplan,et al.  The balanced scorecard--measures that drive performance. , 2015, Harvard business review.

[30]  Uday Kumar,et al.  Use of maintenance performance indicators : a case study at Banverket , 2004 .

[31]  Aditya Parida,et al.  Development of a multi‐criteria hierarchical framework for maintenance performance measurement (MPM) , 2007 .

[32]  Herbert White,et al.  Interoperability of the trans-European high-speed rail system , 2014 .

[33]  A. Bracciali,et al.  Wayside Train Monitoring Systems: A State-of-the-Art and Running Safety Implications , 2012 .

[34]  Rikard Granström A system and stakeholder approach for the identification of condition information: A case study for the Swedish railway , 2008 .

[35]  E. A. Locke,et al.  Goal setting and task performance: 1969–1980. , 1981 .

[36]  Rashmi Malhotra,et al.  Using Data Envelopment Analysis to Analyze the Performance of North American Class I Freight Railroads , 2009 .

[37]  Mattias Holmgren,et al.  Maintenance‐related losses at the Swedish Rail , 2005 .

[38]  Terry Wireman,et al.  Benchmarking Best Practices in Maintenance Management , 2003 .

[39]  Uday Kumar,et al.  Performance based railway infrastructure maintenance : Towards achieving maintenance objectives , 2011 .

[40]  T. Åhrén Maintenance performance indicators (MPIs) for railway infrastructure : identification and analysis for improvement , 2008 .

[41]  Uday Kumar,et al.  Holistic procedure for rail maintenance in Sweden , 2008 .

[42]  Jayantha P. Liyanage,et al.  Towards a value‐based view on operations and maintenance performance management , 2003 .

[43]  Jonathan Boston,et al.  Linking strategy and performance: Developments in the New Zealand public sector , 1997 .

[44]  Peter Söderholm,et al.  Risk-based dependability approach to maintenance performance measurement , 2013 .

[45]  J Santos-Reyes,et al.  A systemic analysis of railway accidents , 2005 .

[46]  Uday Kumar,et al.  Managing information is key to maintenance effectiveness , 2004 .

[47]  Albert H. C. Tsang Maintenance performance management in capital intensive organizations , 2000 .

[48]  R. Dorf,et al.  The Balanced Scorecard: Translating Strategy Into Action , 1997, Proceedings of the IEEE.

[49]  Birre Nyström Use of Availability Concepts in the Railway System , 2009 .

[50]  Robert S. Kaplan,et al.  The evolution of management accounting , 1984 .

[51]  J. Hawkins Cost Accounting: A Managerial Emphasis , 2006 .

[52]  Linda Parker Gates Strategic Planning with Critical Success Factors and Future Scenarios: An Integrated Strategic Planning Framework , 2010 .

[53]  Uday Kumar,et al.  Benchmarking of the Maintenance Process at Banverket (The Swedish National Rail Administration) , 2008 .

[54]  N. Nayab Kaizen: The key to Japan‚s competitive success , 2009 .

[55]  L. Swanson Linking maintenance strategies to performance , 2001 .

[56]  Aditya Parida,et al.  Overall railway infrastructure effectiveness (ORIE): A case study on the Swedish rail network , 2009 .

[57]  T. Davenport,et al.  Data to Knowledge to Results: Building an Analytic Capability , 2001 .

[58]  M Andersson STRATEGIC PLANNING OF TRACK MAINTENANCE. STATE OF THE ART , 2002 .

[59]  Birre Nyström Aspects of improving punctuality : from data to decision in railway maintenance , 2008 .

[60]  Sajeev Abraham George,et al.  A performance benchmarking study of Indian Railway zones , 2008 .

[61]  Aditya Parida,et al.  Human factor in maintenance performance measurement , 2011, 2011 IEEE International Conference on Industrial Engineering and Engineering Management.

[62]  Aditya Parida Maintenance performance measurement system : application of ICT and e-maintenance concepts , 2006 .