Economic Impact in the U.S. of Deepwater Projects: A Survey of Five Projects

This survey report discusses deepwater projects centered in the Gulf Coast. Their study is interested in vendors or contractors supplying the equipment used on the deck and process in extracting oil. The authors are also interested in the socioeconomic effects of the oil extracting on local communities.

[1]  P. Ganguly,et al.  The Pompano Subsea Inspection , 1997 .

[2]  R. Don Vatdeman,et al.  Neptune Project: Overview and Project Management , 1997 .

[3]  James C. Edel,et al.  Fabrication of the Baldpate Compliant Tower , 1999 .

[4]  Vera Flückiger n/a not/available , 2001 .

[5]  Alp Kocaman,et al.  Neptune Project: Spar Hull, Mooring and Topsides Installation , 1997 .

[6]  Kent B. Davies,et al.  Morpeth SeaStar Mini-TLP , 1999 .

[7]  David Gray,et al.  Morpeth Subsea Production System , 1999 .

[8]  William J.F. Roach,et al.  Morpeth Field Development Overview , 1999 .

[9]  Rupert J. Hunt,et al.  Ursa TLP, Tendon & Foundation Design, Fabrication, Transportation and TLP , 1999 .

[10]  James C. Edel,et al.  An Overview of the Baldpate Project , 1999 .

[11]  Kris A. Digre,et al.  Ursa TLP Topside-Module Installation and Hull-Deck-Rig Integration , 1999 .

[12]  K. A. Digre,et al.  Ursa TLP Hull Design, Fabrication and Transportation , 1999 .

[13]  M. M. Beckmann,et al.  Pompano Subsea Development: Template/Manifold, Tree & ROV Intervention Systems , 1996 .

[14]  D. E. Calkins,et al.  Morpeth SeaStar Installation , 1999 .

[15]  Kent B. Davies,et al.  Morpeth SeaStar: Foundation and Tendon System , 1999 .

[16]  D. de Koeijer,et al.  Installation of the Baldpate Compliant Tower , 1999 .

[17]  R. A. Zimmer,et al.  Design and Fabrication of the URSA TLP Deck Modules and TLP Hull Upper Column Frame , 1999 .

[18]  J. Ray McDermott,et al.  Pompano Subsea Development: An Example of How Successful Relationships Result in Effective Project Execution Client/Contractor , 1996 .

[19]  Robert G. Jefferis,et al.  Ursa - Team-Based Project Management - Overcoming Adversity in 4000 ft. of Water , 1999 .

[20]  R. A. Major,et al.  World's First TLP to Achieve Classification , 1999 .

[21]  M. E. Gatlin Operations Role in the Design and Commissioning of the Ursa TLP , 1999 .