An improved robust buffer allocation method for the project scheduling problem
暂无分享,去创建一个
[1] Kalyanmoy Deb,et al. A fast and elitist multiobjective genetic algorithm: NSGA-II , 2002, IEEE Trans. Evol. Comput..
[2] Jennifer Grey,et al. Buffer Techniques For Stochastic Resource Constrained Project Scheduling With Stochastic Task Insertions Problems , 2007 .
[3] Hoong Chuin Lau,et al. Robust execution strategies for project scheduling with unreliable resources and stochastic durations , 2015, J. Sched..
[4] Maurizio Bevilacqua,et al. Robust Multi-Criteria Project Scheduling in Plant Engineering and Construction , 2015 .
[5] M. Klimek,et al. Robust Buffer Allocation for Scheduling of a Project with Predefined Milestones , 2009 .
[6] Gündüz Ulusoy,et al. Proactive project scheduling with a bi-objective genetic algorithm in an R&D department , 2014 .
[7] Fabrice Talla Nobibon,et al. Robust Optimization for the Resource-Constrained Project Scheduling Problem with Duration Uncertainty , 2015 .
[8] Lynn Crawford,et al. Fundamental uncertainties in projects and the scope of project management , 2006 .
[9] Abbas Afshar,et al. Fuzzy multi-objective optimization of finance-based scheduling for construction projects with uncertainties in cost , 2009 .
[10] Carl B Traylor. Project Management: A Systems Approach to Planning, Scheduling, and Controlling , 2014 .
[11] Shahram Shadrokh,et al. Bi-objective resource-constrained project scheduling with robustness and makespan criteria , 2006, Appl. Math. Comput..
[12] Gündüz Ulusoy,et al. A bi-objective genetic algorithm approach to risk mitigation in project scheduling , 2008 .
[13] Xu Wang,et al. Multi-objective optimization model for multi-project scheduling on critical chain , 2014, Adv. Eng. Softw..
[14] Erik Demeulemeester,et al. A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations , 2014, Journal of Scheduling.
[15] Mohamed Haouari,et al. A two-stage-priority-rule-based algorithm for robust resource-constrained project scheduling , 2008, Comput. Ind. Eng..
[16] Wu Cheng. Solving multi-mode project rescheduling problem with PSO algorithm , 2009 .
[17] Dorota Kuchta,et al. A note on the paper by M. A. Al-Fawzan and M. Haouari about a bi-objective problem for robust resource-constrained project scheduling , 2007 .
[19] Sławomir Biruk,et al. THE METHOD FOR IMPROVING STABILITY OF CONSTRUCTION PROJECT SCHEDULES THROUGH BUFFER ALLOCATION / STATYBOS VYKDYMO GRAFIKO STABILUMO UŽTIKRINIMAS PASKIRSTANT LAIKO REZERVUS , 2011 .
[20] Mohammad Khalilzadeh,et al. A Modified PSO Algorithm for Minimizing the Total Costs of Resources in MRCPSP , 2012 .
[21] Mohamed Haouari,et al. A bi-objective model for robust resource-constrained project scheduling , 2005 .
[22] Willy Herroelen,et al. Project scheduling under uncertainty: Survey and research potentials , 2005, Eur. J. Oper. Res..
[23] Richard F. Deckro,et al. Planning and re-planning in project and production scheduling☆ , 2002 .
[24] Stijn Van de Vonder. Proactive-reactive procedures for robust project scheduling , 2006 .
[25] Erik Demeulemeester,et al. A classification of predictive-reactive project scheduling procedures , 2007, J. Sched..
[26] Eghbal Shakeri,et al. Framework for Aligning Project Management with Organizational Strategies , 2015 .
[27] Harold Kerzner,et al. Using the Project Management Maturity Model: Strategic Planning for Project Management , 2005 .
[28] Markus König. Robust Construction Scheduling Using Discrete-Event Simulation , 2011 .
[29] George Mavrotas,et al. An improved version of the augmented ε-constraint method (AUGMECON2) for finding the exact pareto set in multi-objective integer programming problems , 2013, Appl. Math. Comput..
[30] Erik Demeulemeester,et al. Proactive heuristic procedures for robust project scheduling: An experimental analysis , 2008, Eur. J. Oper. Res..